Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2009
Principal Product Liquid and solid CO2
NAICS 325120 - Industrial Gas Manufacturing
SIC 2813 - Industrial Gases
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 112,500
Annual Production 405,000,000 Pounds
Production Hrs. Annual 8,600
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,961,435 46,452,000 kWh $0.04
Electricity Demand $1,087,389 77,791 kW-months/year $13.98
Electricity Fees $38,628 - $ -
Natural Gas $11,423 1,410 MMBtu $8.10
TOTAL ENERGY COSTS $3,098,875
RECOMMENDED SAVINGS* $43,961 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$22,190
Cost:
$6,149
$15,177 359,480 $7,013 502 - - - - - - - - $15,177
359,480
kWh
$7,013
502
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
02: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$5,639
Cost:
$7,629
$3,859 91,408 $1,780 127 - - - - - - - - $3,859
91,408
kWh
$1,780
127
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,706
Cost:
$19,737
$5,239 124,085 $2,421 173 - - $(-1,358) - $404 - - - $5,239
124,085
kWh
$2,421
173
kW-months/year
-
-
MMBtu
$(-1,358)
-
$
$404
-
$
-
-
Tgal
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,909
Cost:
$6,600
- - - - $4,909 606 - - - - - - -
-
kWh
-
-
kW-months/year
$4,909
606
MMBtu
-
-
$
-
-
$
-
-
Tgal
05: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$4,517
Cost:
$3,850
$(-27) (-642) $(-13) (-12) - - - - - - $4,557 - $(-27)
(-642)
kWh
$(-13)
(-12)
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$4,557
-
Tgal
TOTAL RECOMMENDED Savings:
$43,961
Cost:
$43,965
$24,248 574,331 $11,201 790 $4,909 606 $(-1,358) - $404 - $4,557 - $24,248
574,331
kWh
$11,201
790
kW-months/year
$4,909
606
MMBtu
$(-1,358)
-
$
$404
-
$
$4,557
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Water Consumption