Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2009 |
Principal Product | Drawn wire |
NAICS | 331222 - Steel Wire Drawing |
SIC | 3315 - Steel Wire And Related Products |
Sales | $1,000,000-$5,000,000 |
# of Employees | 59 |
Plant Area (Sq.Ft.) | 102,000 |
Annual Production | 3,550,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $132,934 | 4,143,700 | kWh | $0.03 |
Electricity Demand | $72,088 | 8,647 | kW-months/year | $8.34 |
Electricity Fees | $7,055 | - | $ | - |
Natural Gas | $187,058 | 13,596 | MMBtu | $13.76 |
TOTAL ENERGY COSTS | $399,135 | |||
RECOMMENDED SAVINGS* | $11,006 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $3,818 Cost: $5,618 |
$2,510 | 78,229 | $1,308 | 157 | - | - | - | - | - | - |
$2,510 78,229 kWh |
$1,308 157 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,614 Cost: $20,040 |
$2,820 | 87,912 | $1,469 | 176 | - | - | $(-962) | - | $287 | - |
$2,820 87,912 kWh |
$1,469 176 kW-months/year |
- - MMBtu |
$(-962) - $ |
$287 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $931 Cost: - |
$612 | 19,080 | $319 | 38 | - | - | - | - | - | - |
$612 19,080 kWh |
$319 38 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $207 Cost: $100 |
$268 | 8,346 | $139 | 17 | - | - | $(-200) | - | - | - |
$268 8,346 kWh |
$139 17 kW-months/year |
- - MMBtu |
$(-200) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,610 Cost: $2,170 |
$1,069 | 32,400 | $541 | 65 | - | - | - | - | - | - |
$1,069 32,400 kWh |
$541 65 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1232 KEEP BOILER TUBES CLEAN |
Savings: $826 Cost: $1,000 |
- | - | - | - | $826 | 60 | - | - | - | - |
- - kWh |
- - kW-months/year |
$826 60 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $11,006 Cost: $28,928 |
$7,279 | 225,967 | $3,776 | 453 | $826 | 60 | $(-1,162) | - | $287 | - | $7,279 225,967 kWh |
$3,776 453 kW-months/year |
$826 60 MMBtu |
$(-1,162) - $ |
$287 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |