IAC logo
IAC Assessment: NC0396
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0396
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2009
Principal Product Conveyor rollers
NAICS 333922 - Conveyor and Conveying Equipment Manufacturing
SIC 3535 - Conveyors And Conveying Equipment
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 228,297
Annual Production 1,000,000 Pieces
Production Hrs. Annual 4,250
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $139,471 2,811,000 kWh $0.05
Electricity Demand $64,608 7,321 kW-months/year $8.83
Electricity Fees $3,040 - $ -
LPG $7,091 415 MMBtu $17.09
TOTAL ENERGY COSTS $214,210
RECOMMENDED SAVINGS* $150,997 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas LPG Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$76,612
Cost:
$275,318
$23,560 427,281 $13,052 1,563 - - - - $40,000 - $23,560
427,281
kWh
$13,052
1,563
kW-months/year
-
-
MMBtu
-
-
MMBtu
$40,000
-
$
02: 4.5120 CONDENSE OPERATION INTO ONE BUILDING Savings:
$31,185
Cost:
$13,100
$20,537 362,468 $8,544 1,023 - - $2,104 123 - - $20,537
362,468
kWh
$8,544
1,023
kW-months/year
-
-
MMBtu
$2,104
123
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$37,090
Cost:
$83,137
$26,319 475,983 $11,222 1,344 - - - - $(-451) - $26,319
475,983
kWh
$11,222
1,344
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-451)
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$600
Cost:
$558
$600 10,585 - - - - - - - - $600
10,585
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$313
Cost:
$132
$102 1,800 $80 10 - - - - $131 - $102
1,800
kWh
$80
10
kW-months/year
-
-
MMBtu
-
-
MMBtu
$131
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,507
Cost:
-
$1,064 18,785 $443 53 - - - - - - $1,064
18,785
kWh
$443
53
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,690
Cost:
$5,306
- - - - $3,690 216 - - - - -
-
kWh
-
-
kW-months/year
$3,690
216
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$150,997
Cost:
$377,551
$72,182 1,296,902 $33,341 3,993 $3,690 216 $2,104 123 $39,680 - $72,182
1,296,902
kWh
$33,341
3,993
kW-months/year
$3,690
216
MMBtu
$2,104
123
MMBtu
$39,680
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas LPG Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas LPG Ancillary Material Cost