Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2010 |
Principal Product | Food Flavorings |
NAICS | 311930 - Flavoring Syrup and Concentrate Manufacturing |
SIC | 2087 - Flavoring Extracts And Syrups, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 33,000 |
Annual Production | 6,800,000 Pounds |
Production Hrs. Annual | 4,800 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $43,498 | 1,200,560 | kWh | $0.04 |
Electricity Demand | $18,363 | 2,650 | kW-months/year | $6.93 |
Electricity Fees | $2,714 | - | $ | - |
Natural Gas | $45,097 | 3,614 | MMBtu | $12.48 |
TOTAL ENERGY COSTS | $109,672 | |||
RECOMMENDED SAVINGS* | $20,596 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,556 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $9,787 Cost: - |
- | - | - | - | $10,287 | 842 | $(-500) | - | - | - |
- - kWh |
- - kW-months/year |
$10,287 842 MMBtu |
$(-500) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2222 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING |
Savings: $3,632 Cost: $14,000 |
- | - | - | - | $3,632 | 291 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,632 291 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $497 Cost: $100 |
$528 | 16,114 | $329 | 40 | - | - | $(-300) | - | $(-60) | - |
$528 16,114 kWh |
$329 40 kW-months/year |
- - MMBtu |
$(-300) - $ |
$(-60) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,982 Cost: - |
$2,164 | 66,067 | $1,347 | 166 | - | - | $(-723) | - | $194 | - |
$2,164 66,067 kWh |
$1,347 166 kW-months/year |
- - MMBtu |
$(-723) - $ |
$194 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $445 Cost: $1,454 |
$274 | 8,364 | $171 | 21 | - | - | - | - | - | - |
$274 8,364 kWh |
$171 21 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2514 COVER OPEN TANKS |
Savings: $3,253 Cost: - |
$183 | 5,433 | $112 | 14 | $2,958 | 237 | - | - | - | - |
$183 5,433 kWh |
$112 14 kW-months/year |
$2,958 237 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $20,596 Cost: $15,554 |
$3,149 | 95,978 | $1,959 | 241 | $16,877 | 1,370 | $(-1,523) | - | $134 | - | $3,149 95,978 kWh |
$1,959 241 kW-months/year |
$16,877 1,370 MMBtu |
$(-1,523) - $ |
$134 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,556 Cost: $15,554 |
$2,966 | 90,545 | $1,847 | 227 | $3,632 | 291 | $(-1,023) | - | $134 | - | $2,966 90,545 kWh |
$1,847 227 kW-months/year |
$3,632 291 MMBtu |
$(-1,023) - $ |
$134 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |