IAC Assessment: NC0409
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0409
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2010
Principal Product Fire hose
NAICS 314999 - All Other Miscellaneous Textile Product Mills
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 150,000
Annual Production 300 Thousand Feet
Production Hrs. Annual 4,500
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,013 2,264,900 kWh $0.06
Electricity Demand $63,130 7,600 kW-months/year $8.31
Electricity Fees $2,085 - $ -
LPG $20,730 614 MMBtu $33.76
Fuel Oil #2 $74,519 5,590 MMBtu $13.33
TOTAL ENERGY COSTS $285,477
RECOMMENDED SAVINGS* $6,265 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,265
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,415
Cost:
$50
$1,007 18,315 $408 49 - - - - - - $1,007
18,315
kWh
$408
49
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$613
Cost:
$100
$692 12,587 $281 34 - - $(-300) - $(-60) - $692
12,587
kWh
$281
34
kW-months/year
-
-
MMBtu
$(-300)
-
$
$(-60)
-
$
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,256
Cost:
$2,538
$894 16,270 $362 43 - - - - - - $894
16,270
kWh
$362
43
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$204
Cost:
$100
- - - - $204 11 - - - - -
-
kWh
-
-
kW-months/year
$204
11
MMBtu
-
-
$
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,539
Cost:
$736
$1,539 28,000 - - - - - - - - $1,539
28,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$969
Cost:
$1,151
$690 12,547 $279 33 - - - - - - $690
12,547
kWh
$279
33
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$269
Cost:
$133
$269 4,896 - - - - - - - - $269
4,896
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$6,265
Cost:
$4,808
$5,091 92,615 $1,330 159 $204 11 $(-300) - $(-60) - $5,091
92,615
kWh
$1,330
159
kW-months/year
$204
11
MMBtu
$(-300)
-
$
$(-60)
-
$
TOTAL IMPLEMENTED Savings:
$6,265
Cost:
$4,808
$5,091 92,615 $1,330 159 $204 11 $(-300) - $(-60) - $5,091
92,615
kWh
$1,330
159
kW-months/year
$204
11
MMBtu
$(-300)
-
$
$(-60)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Ancillary Material Cost