IAC Assessment: NC0414
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0414
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2010
Principal Product Perlite
NAICS 327992 - Ground or Treated Mineral and Earth Manufacturing
SIC 3295 - Minerals, Ground Or Treated
Sales $5,000,000-$10,000,000
# of Employees 10
Plant Area (Sq.Ft.) 8,275
Annual Production 24,000,000 Pounds
Production Hrs. Annual 4,800
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,778 820,000 kWh $0.07
Electricity Demand $12,034 2,461 kW-months/year $4.89
Electricity Fees $2,459 - $ -
Natural Gas $168,946 33,826 MMBtu $4.99
TOTAL ENERGY COSTS $241,217
RECOMMENDED SAVINGS* $17,976 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,008
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$11,924
Cost:
$26,000
- - - - $11,924 2,347 - - - - -
-
kWh
-
-
kW-months/year
$11,924
2,347
MMBtu
-
-
$
-
-
$
02: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,188
Cost:
$1,991
$1,012 14,398 $176 36 - - - - - - $1,012
14,398
kWh
$176
36
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,044
Cost:
$680
$1,044 14,850 - - - - - - - - $1,044
14,850
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,335
Cost:
$50
$1,137 16,176 $198 40 - - - - - - $1,137
16,176
kWh
$198
40
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$305
Cost:
$100
$566 8,057 $99 20 - - $(-300) - $(-60) - $566
8,057
kWh
$99
20
kW-months/year
-
-
MMBtu
$(-300)
-
$
$(-60)
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$556
Cost:
$1,692
$525 7,462 $91 18 - - $(-82) - $22 - $525
7,462
kWh
$91
18
kW-months/year
-
-
MMBtu
$(-82)
-
$
$22
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$488
Cost:
$562
$326 4,631 $81 17 - - - - $81 - $326
4,631
kWh
$81
17
kW-months/year
-
-
MMBtu
-
-
$
$81
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$868
Cost:
$1,450
$790 11,232 $78 16 - - - - - - $790
11,232
kWh
$78
16
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$268
Cost:
$499
$268 3,807 - - - - - - - - $268
3,807
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$17,976
Cost:
$33,024
$5,668 80,613 $723 147 $11,924 2,347 $(-382) - $43 - $5,668
80,613
kWh
$723
147
kW-months/year
$11,924
2,347
MMBtu
$(-382)
-
$
$43
-
$
TOTAL IMPLEMENTED Savings:
$5,008
Cost:
$6,344
$4,624 65,763 $723 147 - - $(-382) - $43 - $4,624
65,763
kWh
$723
147
kW-months/year
-
-
MMBtu
$(-382)
-
$
$43
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost