IAC logo
IAC Assessment: NC0415
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0415
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2010
Principal Product Sofas and mattresses
NAICS 337121 - Upholstered Household Furniture Manufacturing
SIC 2515 - Mattresses And Bedsprings
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 733,500
Annual Production 150,000 Pieces
Production Hrs. Annual 4,000
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $131,583 1,800,000 kWh $0.07
Electricity Demand $38,934 4,450 kW-months/year $8.75
Electricity Fees $600 - $ -
Natural Gas $54,189 4,847 MMBtu $11.18
TOTAL ENERGY COSTS $225,306
RECOMMENDED SAVINGS* $25,915 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,513
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,456
Cost:
$3,200
$1,848 33,920 $890 102 - - - - $(-282) - - - $1,848
33,920
kWh
$890
102
kW-months/year
-
-
MMBtu
-
-
$
$(-282)
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$937
Cost:
$50
$762 13,982 $175 20 - - - - - - - - $762
13,982
kWh
$175
20
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,465
Cost:
$500
- - - - $1,465 131 - - - - - - -
-
kWh
-
-
kW-months/year
$1,465
131
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$146
Cost:
$50
$558 10,248 $128 15 - - $(-300) - - - $(-240) - $558
10,248
kWh
$128
15
kW-months/year
-
-
MMBtu
$(-300)
-
$
-
-
$
$(-240)
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$911
Cost:
$1,846
$615 11,286 $296 34 - - - - - - - - $615
11,286
kWh
$296
34
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$12,000
Cost:
$1,000
- - - - - - $12,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,000
-
$
-
-
$
-
-
$
07: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$8,000
Cost:
$15,750
- - - - - - $8,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,000
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$25,915
Cost:
$22,396
$3,783 69,436 $1,489 171 $1,465 131 $19,700 - $(-282) - $(-240) - $3,783
69,436
kWh
$1,489
171
kW-months/year
$1,465
131
MMBtu
$19,700
-
$
$(-282)
-
$
$(-240)
-
$
TOTAL IMPLEMENTED Savings:
$23,513
Cost:
$21,846
$3,021 55,454 $1,314 151 - - $19,700 - $(-282) - $(-240) - $3,021
55,454
kWh
$1,314
151
kW-months/year
-
-
MMBtu
$19,700
-
$
$(-282)
-
$
$(-240)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost