Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2010 |
Principal Product | Wood door skins |
NAICS | 321219 - Reconstituted Wood Product Manufacturing |
SIC | 2493 - Reconstituted Wood Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 6,500,000 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,099,743 | 34,441,200 | kWh | $0.03 |
Electricity Demand | $500,257 | 57,183 | kW-months/year | $8.75 |
Natural Gas | $398,965 | 65,297 | MMBtu | $6.11 |
TOTAL ENERGY COSTS | $1,998,965 | |||
RECOMMENDED SAVINGS* | $400,971 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,764 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1232 KEEP BOILER TUBES CLEAN |
Savings: $359,066 Cost: $411,700 |
- | - | - | - | $359,066 | 58,767 | - | - | - | - |
- - kWh |
- - kW-months/year |
$359,066 58,767 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $14,117 Cost: $50 |
$9,542 | 289,583 | $4,575 | 552 | - | - | - | - | - | - |
$9,542 289,583 kWh |
$4,575 552 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,948 Cost: $100 |
$8,478 | 257,288 | $4,070 | 491 | - | - | $(-2,400) | - | $(-1,200) | - |
$8,478 257,288 kWh |
$4,070 491 kW-months/year |
- - MMBtu |
$(-2,400) - $ |
$(-1,200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $11,462 Cost: $6,800 |
- | - | - | - | $11,462 | 1,876 | - | - | - | - |
- - kWh |
- - kW-months/year |
$11,462 1,876 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,679 Cost: $30,438 |
$5,533 | 167,921 | $2,496 | 301 | - | - | $(-1,837) | - | $487 | - |
$5,533 167,921 kWh |
$2,496 301 kW-months/year |
- - MMBtu |
$(-1,837) - $ |
$487 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $284 Cost: $568 |
$197 | 5,973 | $87 | 10 | - | - | - | - | - | - |
$197 5,973 kWh |
$87 10 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $415 Cost: $949 |
$415 | 12,580 | - | - | - | - | - | - | - | - |
$415 12,580 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $400,971 Cost: $450,605 |
$24,165 | 733,345 | $11,228 | 1,354 | $370,528 | 60,643 | $(-4,237) | - | $(-713) | - | $24,165 733,345 kWh |
$11,228 1,354 kW-months/year |
$370,528 60,643 MMBtu |
$(-4,237) - $ |
$(-713) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,764 Cost: $1,667 |
$18,632 | 565,424 | $8,732 | 1,053 | - | - | $(-2,400) | - | $(-1,200) | - | $18,632 565,424 kWh |
$8,732 1,053 kW-months/year |
- - MMBtu |
$(-2,400) - $ |
$(-1,200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |