Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2011 |
Principal Product | PVC mouldings |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 450 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 90,500,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,529,622 | 34,404,450 | kWh | $0.04 |
Electricity Demand | $620,986 | 62,223 | kW-months/year | $9.98 |
Electricity Fees | $252,845 | - | $ | - |
Natural Gas | $383,090 | 70,676 | MMBtu | $5.42 |
TOTAL ENERGY COSTS | $2,786,543 | |||
RECOMMENDED SAVINGS* | $1,655,037 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,512,924 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Water Consumption | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Water Consumption | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.113 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT |
Savings: $1,468,749 Cost: $650,000 |
$105,844 | 2,380,664 | $22,515 | 2,256 | - | - | - | - | - | - | $(-29,610) | - | $1,370,000 | - |
$105,844 2,380,664 kWh |
$22,515 2,256 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
$(-29,610) - Tgal |
$1,370,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,736 Cost: $100 |
$5,726 | 128,800 | $1,850 | 185 | - | - | $(-600) | - | $(-240) | - | - | - | - | - |
$5,726 128,800 kWh |
$1,850 185 kW-months/year |
- - MMBtu |
$(-600) - $ |
$(-240) - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $26,211 Cost: $60,000 |
$21,437 | 482,160 | $6,874 | 689 | - | - | - | - | - | - | $(-2,100) | - | - | - |
$21,437 482,160 kWh |
$6,874 689 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
$(-2,100) - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $24,869 Cost: $42,000 |
- | - | - | - | $24,869 | 4,588 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$24,869 4,588 MMBtu |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $86,720 Cost: $87,892 |
- | - | - | - | $86,720 | 16,000 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$86,720 16,000 MMBtu |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $34,209 Cost: $115,608 |
$30,013 | 675,058 | $9,625 | 964 | - | - | - | - | $(-5,429) | - | - | - | - | - |
$30,013 675,058 kWh |
$9,625 964 kW-months/year |
- - MMBtu |
- - $ |
$(-5,429) - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,230 Cost: $4,585 |
$2,441 | 54,906 | $789 | 79 | - | - | - | - | - | - | - | - | - | - |
$2,441 54,906 kWh |
$789 79 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $4,313 Cost: $12,378 |
$4,313 | 97,015 | - | - | - | - | - | - | - | - | - | - | - | - |
$4,313 97,015 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,655,037 Cost: $972,563 |
$169,774 | 3,818,603 | $41,653 | 4,173 | $111,589 | 20,588 | $(-600) | - | $(-5,669) | - | $(-31,710) | - | $1,370,000 | - | $169,774 3,818,603 kWh |
$41,653 4,173 kW-months/year |
$111,589 20,588 MMBtu |
$(-600) - $ |
$(-5,669) - $ |
$(-31,710) - Tgal |
$1,370,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,512,924 Cost: $770,293 |
$144,024 | 3,239,428 | $34,779 | 3,484 | - | - | $(-600) | - | $(-5,669) | - | $(-29,610) | - | $1,370,000 | - | $144,024 3,239,428 kWh |
$34,779 3,484 kW-months/year |
- - MMBtu |
$(-600) - $ |
$(-5,669) - $ |
$(-29,610) - Tgal |
$1,370,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Water Consumption | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Water Consumption | Primary Product |