IAC Assessment: NC0424
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2011
Principal Product Yarn
NAICS 313110 - Fiber, Yarn, and Thread Mills
SIC 2281 - Yarn Spinning Mills
Sales $100,000,000-$500,000,000
# of Employees 260
Plant Area (Sq.Ft.) 343,186
Annual Production 86,400,000 Pounds
Production Hrs. Annual 8,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,996,818 93,038,400 kWh $0.04
Electricity Demand $1,786,820 151,328 kW-months/year $11.81
Electricity Fees $12,023 - $ -
TOTAL ENERGY COSTS $5,795,661
RECOMMENDED SAVINGS* $133,732 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $54,587
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ $ $ $ $ Tgal
01: 3.4141 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE Savings:
$51,507
Cost:
$142,273
$(-3,633) (-84,578) $(-1,381) (-117) - - $75,361 - $(-18,840) - $(-3,633)
(-84,578)
kWh
$(-1,381)
(-117)
kW-months/year
-
-
$
$75,361
-
$
$(-18,840)
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$30,681
Cost:
$112,768
$24,527 570,931 $9,665 816 - - $(-3,511) - - - $24,527
570,931
kWh
$9,665
816
kW-months/year
-
-
$
$(-3,511)
-
$
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,430
Cost:
$4,435
$1,743 40,572 $687 58 - - - - - - $1,743
40,572
kWh
$687
58
kW-months/year
-
-
$
-
-
$
-
-
Tgal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,685
Cost:
$78,795
$13,940 324,497 $2,745 232 - - - - - - $13,940
324,497
kWh
$2,745
232
kW-months/year
-
-
$
-
-
$
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,791
Cost:
$100
$4,038 93,996 $1,593 134 $(-600) - $(-240) - - - $4,038
93,996
kWh
$1,593
134
kW-months/year
$(-600)
-
$
$(-240)
-
$
-
-
Tgal
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$27,638
Cost:
$74,990
$21,061 490,250 $6,577 555 - - - - - - $21,061
490,250
kWh
$6,577
555
kW-months/year
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$133,732
Cost:
$413,361
$61,676 1,435,668 $19,886 1,678 $(-600) - $71,610 - $(-18,840) - $61,676
1,435,668
kWh
$19,886
1,678
kW-months/year
$(-600)
-
$
$71,610
-
$
$(-18,840)
-
Tgal
TOTAL IMPLEMENTED Savings:
$54,587
Cost:
$196,098
$44,248 1,029,996 $14,690 1,240 $(-600) - $(-3,751) - - - $44,248
1,029,996
kWh
$14,690
1,240
kW-months/year
$(-600)
-
$
$(-3,751)
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Water Consumption