Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2011 |
Principal Product | Foam insulation |
NAICS | 326150 - Urethane and Other Foam Product (except Polystyrene) Manufacturing |
SIC | 3086 - Plastics Foam Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 81 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 30,000 Thousand Feet |
Production Hrs. Annual | 6,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $343,404 | 5,472,454 | kWh | $0.06 |
Electricity Demand | $299,212 | 10,246 | kW-months/year | $29.20 |
Electricity Fees | $2,113 | - | $ | - |
Natural Gas | $36,029 | 3,085 | MMBtu | $11.68 |
TOTAL ENERGY COSTS | $680,758 | |||
RECOMMENDED SAVINGS* | $295,433 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $227,259 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Personnel Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Personnel Changes | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $145,527 Cost: $450,915 |
$18,786 | 299,377 | $194,671 | 7,185 | $1,962 | 168 | $(-69,892) | (-2,768) | - | - | - | - | - | - |
$18,786 299,377 kWh |
$194,671 7,185 kW-months/year |
$1,962 168 MMBtu |
$(-69,892) (-2,768) MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $60,444 Cost: $94,425 |
$(-7,844) | (-125,000) | $(-6,762) | (-250) | - | - | - | - | - | - | $(-1,000) | - | $76,050 | - |
$(-7,844) (-125,000) kWh |
$(-6,762) (-250) kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
$(-1,000) - $ |
$76,050 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $72,294 Cost: $287,294 |
$42,622 | 697,236 | $36,747 | 1,358 | - | - | - | - | - | - | $(-7,075) | - | - | - |
$42,622 697,236 kWh |
$36,747 1,358 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
$(-7,075) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,540 Cost: $13,050 |
$1,648 | 26,257 | $1,892 | 70 | - | - | - | - | - | - | - | - | - | - |
$1,648 26,257 kWh |
$1,892 70 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $307 Cost: $750 |
$307 | 4,890 | - | - | - | - | - | - | - | - | - | - | - | - |
$307 4,890 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3113 MAKE ICE DURING OFF PEAK HOURS FOR COOLING |
Savings: $7,730 Cost: $47,000 |
- | - | $7,730 | 366 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$7,730 366 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,910 Cost: $25 |
$2,638 | 42,038 | $2,272 | 84 | - | - | - | - | - | - | - | - | - | - |
$2,638 42,038 kWh |
$2,272 84 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $681 Cost: $100 |
$527 | 8,400 | $454 | 17 | - | - | - | - | $(-180) | - | $(-120) | - | - | - |
$527 8,400 kWh |
$454 17 kW-months/year |
- - MMBtu |
- - MMBtu |
$(-180) - $ |
$(-120) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $295,433 Cost: $893,559 |
$58,684 | 953,198 | $237,004 | 8,830 | $1,962 | 168 | $(-69,892) | (-2,768) | $(-180) | - | $(-8,195) | - | $76,050 | - | $58,684 953,198 kWh |
$237,004 8,830 kW-months/year |
$1,962 168 MMBtu |
$(-69,892) (-2,768) MMBtu |
$(-180) - $ |
$(-8,195) - $ |
$76,050 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $227,259 Cost: $752,134 |
$66,528 | 1,078,198 | $236,036 | 8,714 | $1,962 | 168 | $(-69,892) | (-2,768) | $(-180) | - | $(-7,195) | - | - | - | $66,528 1,078,198 kWh |
$236,036 8,714 kW-months/year |
$1,962 168 MMBtu |
$(-69,892) (-2,768) MMBtu |
$(-180) - $ |
$(-7,195) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |