Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2011 |
Principal Product | Automatic doors |
NAICS | 332321 - Metal Window and Door Manufacturing |
SIC | 3442 - Metal Doors, Sash, And Trim |
Sales | $10,000,000-$50,000,000 |
# of Employees | 54 |
Plant Area (Sq.Ft.) | 118,930 |
Annual Production | 23,000 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | NC |
View Case Study |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $77,853 | 2,011,200 | kWh | $0.04 |
Electricity Demand | $53,221 | 5,009 | kW-months/year | $10.63 |
Electricity Fees | $4,375 | - | $ | - |
Natural Gas | $12,000 | 1,220 | MMBtu | $9.84 |
TOTAL ENERGY COSTS | $147,449 | |||
RECOMMENDED SAVINGS* | $25,909 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $24,628 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $9,700 Cost: $100 |
$6,307 | - | $3,393 | - | - | - | - | - | - | - |
$6,307 - kWh |
$3,393 - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $13,126 Cost: $45,273 |
$7,933 | 204,938 | $5,751 | 565 | - | - | - | - | $(-558) | - |
$7,933 204,938 kWh |
$5,751 565 kW-months/year |
- - MMBtu |
- - $ |
$(-558) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $504 Cost: $409 |
$309 | 7,986 | $195 | 19 | - | - | - | - | - | - |
$309 7,986 kWh |
$195 19 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $1,281 Cost: $2,625 |
$813 | 20,998 | $275 | 27 | - | - | - | - | $193 | - |
$813 20,998 kWh |
$275 27 kW-months/year |
- - MMBtu |
- - $ |
$193 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $825 Cost: $910 |
- | - | - | - | $825 | 84 | - | - | - | - |
- - kWh |
- - kW-months/year |
$825 84 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $193 Cost: $100 |
$204 | 5,263 | $109 | 11 | - | - | $(-100) | - | $(-20) | - |
$204 5,263 kWh |
$109 11 kW-months/year |
- - MMBtu |
$(-100) - $ |
$(-20) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $280 Cost: - |
$183 | 4,719 | $97 | 10 | - | - | - | - | - | - |
$183 4,719 kWh |
$97 10 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $25,909 Cost: $49,417 |
$15,749 | 243,904 | $9,820 | 632 | $825 | 84 | $(-100) | - | $(-385) | - | $15,749 243,904 kWh |
$9,820 632 kW-months/year |
$825 84 MMBtu |
$(-100) - $ |
$(-385) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $24,628 Cost: $46,792 |
$14,936 | 222,906 | $9,545 | 605 | $825 | 84 | $(-100) | - | $(-578) | - | $14,936 222,906 kWh |
$9,545 605 kW-months/year |
$825 84 MMBtu |
$(-100) - $ |
$(-578) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |