IAC Assessment: NC0439
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0439
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2011
Principal Product Railroad friction shoes
NAICS 331511 - Iron Foundries
SIC 3321 - Gray And Ductile Iron Foundries
Sales $50,000,000-$100,000,000
# of Employees 158
Plant Area (Sq.Ft.) 100,000
Annual Production 6,000,000 Pieces
Production Hrs. Annual 7,200
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $717,180 13,923,600 kWh $0.05
Electricity Demand $266,218 31,891 kW-months/year $8.35
Electricity Fees $4,610 - $ -
Natural Gas $201,689 23,486 MMBtu $8.59
TOTAL ENERGY COSTS $1,198,986
RECOMMENDED SAVINGS* $73,060 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,276
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$37,298
Cost:
$27,675
- - - - $37,298 4,342 - - - - - - -
-
kWh
-
-
kW-months/year
$37,298
4,342
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,669
Cost:
$39,646
$18,706 363,156 $5,038 604 - - - - - - $(-1,075) - $18,706
363,156
kWh
$5,038
604
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$(-1,075)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$330
Cost:
$106
$260 5,040 $70 8 - - - - - - - - $260
5,040
kWh
$70
8
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$3,390
Cost:
$4,200
- - - - - - $3,390 1,206,390 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,390
1,206,390
Tgal
-
-
$
-
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$4,934
Cost:
$2,393
$4,570 69,849 $364 44 - - - - - - - - $4,570
69,849
kWh
$364
44
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,486
Cost:
$1,800
- - - - $1,486 173 - - - - - - -
-
kWh
-
-
kW-months/year
$1,486
173
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,953
Cost:
$100
$3,458 67,140 $935 112 - - - - $(-1,200) - $(-240) - $3,458
67,140
kWh
$935
112
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-1,200)
-
$
$(-240)
-
$
TOTAL RECOMMENDED Savings:
$73,060
Cost:
$75,920
$26,994 505,185 $6,407 768 $38,784 4,515 $3,390 1,206,390 $(-1,200) - $(-1,315) - $26,994
505,185
kWh
$6,407
768
kW-months/year
$38,784
4,515
MMBtu
$3,390
1,206,390
Tgal
$(-1,200)
-
$
$(-1,315)
-
$
TOTAL IMPLEMENTED Savings:
$34,276
Cost:
$46,445
$26,994 505,185 $6,407 768 - - $3,390 1,206,390 $(-1,200) - $(-1,315) - $26,994
505,185
kWh
$6,407
768
kW-months/year
-
-
MMBtu
$3,390
1,206,390
Tgal
$(-1,200)
-
$
$(-1,315)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost