Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2011 |
Principal Product | Carpet |
NAICS | 314110 - Carpet and Rug Mills |
SIC | 2273 - Carpets And Rugs |
Sales | $10,000,000-$50,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 600,000 |
Annual Production | 9,000 Thousand Feet |
Production Hrs. Annual | 6,600 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $868,049 | 18,348,445 | kWh | $0.05 |
Electricity Demand | $485,246 | 43,133 | kW-months/year | $11.25 |
Electricity Fees | $40,700 | - | $ | - |
Natural Gas | $604,738 | 102,849 | MMBtu | $5.88 |
TOTAL ENERGY COSTS | $1,998,733 | |||
RECOMMENDED SAVINGS* | $182,527 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $179,177 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $157,713 Cost: $165,618 |
$113,029 | 2,184,554 | $44,684 | 3,972 | - | - | - | - | - | - |
$113,029 2,184,554 kWh |
$44,684 3,972 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $15,127 Cost: $20,158 |
$10,738 | 207,539 | $4,389 | 390 | - | - | - | - | - | - |
$10,738 207,539 kWh |
$4,389 390 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $3,350 Cost: $800 |
- | - | - | - | $3,350 | 560 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,350 560 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,025 Cost: $500 |
$2,770 | 53,544 | $1,095 | 97 | - | - | $(-600) | - | $(-240) | - |
$2,770 53,544 kWh |
$1,095 97 kW-months/year |
- - MMBtu |
$(-600) - $ |
$(-240) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $3,312 Cost: $8,420 |
$2,373 | 45,870 | $939 | 83 | - | - | - | - | - | - |
$2,373 45,870 kWh |
$939 83 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $182,527 Cost: $195,496 |
$128,910 | 2,491,507 | $51,107 | 4,542 | $3,350 | 560 | $(-600) | - | $(-240) | - | $128,910 2,491,507 kWh |
$51,107 4,542 kW-months/year |
$3,350 560 MMBtu |
$(-600) - $ |
$(-240) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $179,177 Cost: $194,696 |
$128,910 | 2,491,507 | $51,107 | 4,542 | - | - | $(-600) | - | $(-240) | - | $128,910 2,491,507 kWh |
$51,107 4,542 kW-months/year |
- - MMBtu |
$(-600) - $ |
$(-240) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |