IAC logo
IAC Assessment: NC0440
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0440
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2011
Principal Product Carpet
NAICS 314110 - Carpet and Rug Mills
SIC 2273 - Carpets And Rugs
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 600,000
Annual Production 9,000 Thousand Feet
Production Hrs. Annual 6,600
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $868,049 18,348,445 kWh $0.05
Electricity Demand $485,246 43,133 kW-months/year $11.25
Electricity Fees $40,700 - $ -
Natural Gas $604,738 102,849 MMBtu $5.88
TOTAL ENERGY COSTS $1,998,733
RECOMMENDED SAVINGS* $182,527 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $179,177
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$157,713
Cost:
$165,618
$113,029 2,184,554 $44,684 3,972 - - - - - - $113,029
2,184,554
kWh
$44,684
3,972
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$15,127
Cost:
$20,158
$10,738 207,539 $4,389 390 - - - - - - $10,738
207,539
kWh
$4,389
390
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,350
Cost:
$800
- - - - $3,350 560 - - - - -
-
kWh
-
-
kW-months/year
$3,350
560
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,025
Cost:
$500
$2,770 53,544 $1,095 97 - - $(-600) - $(-240) - $2,770
53,544
kWh
$1,095
97
kW-months/year
-
-
MMBtu
$(-600)
-
$
$(-240)
-
$
05: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$3,312
Cost:
$8,420
$2,373 45,870 $939 83 - - - - - - $2,373
45,870
kWh
$939
83
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$182,527
Cost:
$195,496
$128,910 2,491,507 $51,107 4,542 $3,350 560 $(-600) - $(-240) - $128,910
2,491,507
kWh
$51,107
4,542
kW-months/year
$3,350
560
MMBtu
$(-600)
-
$
$(-240)
-
$
TOTAL IMPLEMENTED Savings:
$179,177
Cost:
$194,696
$128,910 2,491,507 $51,107 4,542 - - $(-600) - $(-240) - $128,910
2,491,507
kWh
$51,107
4,542
kW-months/year
-
-
MMBtu
$(-600)
-
$
$(-240)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost