IAC logo
IAC Assessment: NC0445
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0445
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2012
Principal Product Lumber for furniture
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 52
Plant Area (Sq.Ft.) 150,000
Annual Production 13,000 Thousand Feet
Production Hrs. Annual 2,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $159,640 3,286,100 kWh $0.05
Electricity Demand $37,561 8,241 kW-months/year $4.56
Electricity Fees $5,245 - $ -
LPG $6,000 356 MMBtu $16.85
Wood $1 37,600 MMBtu $0.00
TOTAL ENERGY COSTS $208,447
RECOMMENDED SAVINGS* $22,649 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,805
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand LPG Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,196
Cost:
-
$835 15,709 $361 94 - - - - - - - - $835
15,709
kWh
$361
94
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$575
Cost:
$100
$988 18,575 $427 111 - - $(-600) - - - $(-240) - $988
18,575
kWh
$427
111
kW-months/year
-
-
MMBtu
$(-600)
-
$
-
-
$
$(-240)
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,573
Cost:
$7,197
$(-79) (-1,492) $(-34) (-9) $1,686 100 - - - - - - $(-79)
(-1,492)
kWh
$(-34)
(-9)
kW-months/year
$1,686
100
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$17,271
Cost:
$73,750
$15,720 295,650 $1,551 405 - - - - - - - - $15,720
295,650
kWh
$1,551
405
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$336
Cost:
$126
$236 4,402 $100 26 - - - - - - - - $236
4,402
kWh
$100
26
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,698
Cost:
$7,891
$1,190 22,372 $514 134 - - - - $(-6) - - - $1,190
22,372
kWh
$514
134
kW-months/year
-
-
MMBtu
-
-
$
$(-6)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$22,649
Cost:
$89,064
$18,890 355,216 $2,919 761 $1,686 100 $(-600) - $(-6) - $(-240) - $18,890
355,216
kWh
$2,919
761
kW-months/year
$1,686
100
MMBtu
$(-600)
-
$
$(-6)
-
$
$(-240)
-
$
TOTAL IMPLEMENTED Savings:
$3,805
Cost:
$8,117
$3,249 61,058 $1,402 365 - - $(-600) - $(-6) - $(-240) - $3,249
61,058
kWh
$1,402
365
kW-months/year
-
-
MMBtu
$(-600)
-
$
$(-6)
-
$
$(-240)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand LPG Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand LPG Personnel Changes Administrative Changes Ancillary Material Cost