Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2012 |
Principal Product | Solid rubber wheels |
NAICS | 326299 - All Other Rubber Product Manufacturing |
SIC | 3069 - Fabricated Rubber Products, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 30 |
Plant Area (Sq.Ft.) | 53,000 |
Annual Production | 6,000,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $76,173 | 2,247,300 | kWh | $0.03 |
Electricity Demand | $39,665 | 4,220 | kW-months/year | $9.40 |
TOTAL ENERGY COSTS | $115,838 | |||
RECOMMENDED SAVINGS* | $10,816 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,160 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Disposal | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,790 Cost: $14,320 |
$4,404 | 129,948 | $1,771 | 188 | - | - | $(-385) | - |
$4,404 129,948 kWh |
$1,771 188 kW-months/year |
- - Tgal |
$(-385) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $444 Cost: $1,674 |
$190 | 5,618 | $254 | 27 | - | - | - | - |
$190 5,618 kWh |
$254 27 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $252 Cost: $533 |
$252 | 7,433 | - | - | - | - | - | - |
$252 7,433 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE |
Savings: $2,656 Cost: $1,800 |
$2,628 | 77,550 | $1,086 | 116 | $(-1,058) | (-211,600) | - | - |
$2,628 77,550 kWh |
$1,086 116 kW-months/year |
$(-1,058) (-211,600) Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,516 Cost: $4,075 |
$845 | 24,929 | $671 | 71 | - | - | - | - |
$845 24,929 kWh |
$671 71 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $158 Cost: $100 |
$185 | 5,460 | $73 | 8 | - | - | $(-100) | - |
$185 5,460 kWh |
$73 8 kW-months/year |
- - Tgal |
$(-100) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $10,816 Cost: $22,502 |
$8,504 | 250,938 | $3,855 | 410 | $(-1,058) | (-211,600) | $(-485) | - | $8,504 250,938 kWh |
$3,855 410 kW-months/year |
$(-1,058) (-211,600) Tgal |
$(-485) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,160 Cost: $20,702 |
$5,876 | 173,388 | $2,769 | 294 | - | - | $(-485) | - | $5,876 173,388 kWh |
$2,769 294 kW-months/year |
- - Tgal |
$(-485) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Disposal | Ancillary Material Cost |