IAC Assessment: NC0451
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0451
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2012
Principal Product Solid rubber wheels
NAICS 326299 - All Other Rubber Product Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 53,000
Annual Production 6,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,173 2,247,300 kWh $0.03
Electricity Demand $39,665 4,220 kW-months/year $9.40
TOTAL ENERGY COSTS $115,838
RECOMMENDED SAVINGS* $10,816 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,160
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,790
Cost:
$14,320
$4,404 129,948 $1,771 188 - - $(-385) - $4,404
129,948
kWh
$1,771
188
kW-months/year
-
-
Tgal
$(-385)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$444
Cost:
$1,674
$190 5,618 $254 27 - - - - $190
5,618
kWh
$254
27
kW-months/year
-
-
Tgal
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$252
Cost:
$533
$252 7,433 - - - - - - $252
7,433
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
04: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$2,656
Cost:
$1,800
$2,628 77,550 $1,086 116 $(-1,058) (-211,600) - - $2,628
77,550
kWh
$1,086
116
kW-months/year
$(-1,058)
(-211,600)
Tgal
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,516
Cost:
$4,075
$845 24,929 $671 71 - - - - $845
24,929
kWh
$671
71
kW-months/year
-
-
Tgal
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$158
Cost:
$100
$185 5,460 $73 8 - - $(-100) - $185
5,460
kWh
$73
8
kW-months/year
-
-
Tgal
$(-100)
-
$
TOTAL RECOMMENDED Savings:
$10,816
Cost:
$22,502
$8,504 250,938 $3,855 410 $(-1,058) (-211,600) $(-485) - $8,504
250,938
kWh
$3,855
410
kW-months/year
$(-1,058)
(-211,600)
Tgal
$(-485)
-
$
TOTAL IMPLEMENTED Savings:
$8,160
Cost:
$20,702
$5,876 173,388 $2,769 294 - - $(-485) - $5,876
173,388
kWh
$2,769
294
kW-months/year
-
-
Tgal
$(-485)
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost