IAC logo
IAC Assessment: NC0453
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0453
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2012
Principal Product Museum
NAICS 712110 - Museums
SIC 8412 - Museums And Art Galleries
Sales <$500,000
# of Employees 20
Plant Area (Sq.Ft.) 72,000
Annual Production 1 Units
Production Hrs. Annual 3,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $93,175 1,382,016 kWh $0.07
Electricity Demand $53,251 3,455 kW-months/year $15.41
Natural Gas $42,171 4,516 MMBtu $9.34
TOTAL ENERGY COSTS $188,597
RECOMMENDED SAVINGS* $58,142 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$36,712
Cost:
$21,000
$10,525 24,876 $33,195 - - - $(-7,008) (-283) - - - - $10,525
24,876
kWh
$33,195
-
kW-months/year
-
-
MMBtu
$(-7,008)
(-283)
MMBtu
-
-
$
-
-
$
02: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$1,450
Cost:
$3,000
$672 10,196 $778 45 - - - - - - - - $672
10,196
kWh
$778
45
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$598
Cost:
$1,000
- - - - $598 64 - - - - - - -
-
kWh
-
-
kW-months/year
$598
64
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 3.4132 USE DEIONIZED WATER IN UPSTREAM RINSE TANKS Savings:
$4,110
Cost:
$5,000
- - - - - - - - $4,110 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$4,110
-
$
-
-
$
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,077
Cost:
-
$1,077 16,349 - - - - - - - - - - $1,077
16,349
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,330
Cost:
$600
$664 10,080 $696 40 - - - - - - $(-30) - $664
10,080
kWh
$696
40
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$(-30)
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$650
Cost:
$1,080
$215 3,264 $77 4 - - - - - - $358 - $215
3,264
kWh
$77
4
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$358
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$240
Cost:
$352
$240 3,636 - - - - - - - - - - $240
3,636
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,228
Cost:
$16,470
$3,404 51,659 $3,548 205 - - - - - - $276 - $3,404
51,659
kWh
$3,548
205
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$276
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,747
Cost:
$16,220
$1,186 17,996 $2,483 144 - - - - - - $1,078 - $1,186
17,996
kWh
$2,483
144
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$1,078
-
$
TOTAL RECOMMENDED Savings:
$58,142
Cost:
$64,722
$17,983 138,056 $40,777 438 $598 64 $(-7,008) (-283) $4,110 - $1,682 - $17,983
138,056
kWh
$40,777
438
kW-months/year
$598
64
MMBtu
$(-7,008)
(-283)
MMBtu
$4,110
-
$
$1,682
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Administrative Changes Ancillary Material Cost