IAC logo
IAC Assessment: NC0454
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0454
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2012
Principal Product Museum
NAICS 712110 - Museums
SIC 8412 - Museums And Art Galleries
Sales <$500,000
# of Employees 25
Plant Area (Sq.Ft.) 12,000
Annual Production 1 Units
Production Hrs. Annual 4,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,074 1,255,200 kWh $0.05
Electricity Demand $23,506 2,816 kW-months/year $8.35
TOTAL ENERGY COSTS $88,580
RECOMMENDED SAVINGS* $51,838 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,353
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,289
Cost:
$5,115
$1,128 21,727 $495 59 $1,666 - - - $1,128
21,727
kWh
$495
59
kW-months/year
$1,666
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,774
Cost:
$900
$876 16,878 $471 56 $427 - - - $876
16,878
kWh
$471
56
kW-months/year
$427
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,836
Cost:
$175
$1,276 24,592 $560 67 - - - - $1,276
24,592
kWh
$560
67
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$454
Cost:
$225
$158 3,043 $35 4 $261 - - - $158
3,043
kWh
$35
4
kW-months/year
$261
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$134
Cost:
$529
$134 2,587 - - - - - - $134
2,587
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$3,318
Cost:
$15,000
$1,691 35,602 $1,627 186 - - - - $1,691
35,602
kWh
$1,627
186
kW-months/year
-
-
$
-
-
$
07: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$41,033
Cost:
$60,000
$(-3,114) (-60,006) $(-853) (-102) - - $45,000 - $(-3,114)
(-60,006)
kWh
$(-853)
(-102)
kW-months/year
-
-
$
$45,000
-
$
TOTAL RECOMMENDED Savings:
$51,838
Cost:
$81,944
$2,149 44,423 $2,335 270 $2,354 - $45,000 - $2,149
44,423
kWh
$2,335
270
kW-months/year
$2,354
-
$
$45,000
-
$
TOTAL IMPLEMENTED Savings:
$7,353
Cost:
$6,415
$3,438 66,240 $1,561 186 $2,354 - - - $3,438
66,240
kWh
$1,561
186
kW-months/year
$2,354
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Ancillary Material Cost Primary Product