Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2012 |
Principal Product | Specialty Chemicals |
NAICS | 325199 - All Other Basic Organic Chemical Manufacturing |
SIC | 2869 - Industrial Organic Chemicals, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 62,000 |
Annual Production | 20,000,000 Pounds |
Production Hrs. Annual | 8,600 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $214,158 | 5,754,228 | kWh | $0.04 |
Electricity Demand | $88,177 | 9,361 | kW-months/year | $9.42 |
Electricity Fees | $151 | - | $ | - |
Natural Gas | $1,325,221 | 264,649 | MMBtu | $5.01 |
TOTAL ENERGY COSTS | $1,627,707 | |||
RECOMMENDED SAVINGS* | $105,779 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $35,235 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $36,693 Cost: $65,000 |
- | - | - | - | $36,693 | 7,280 | - | - | - | - |
- - kWh |
- - kW-months/year |
$36,693 7,280 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $34,238 Cost: $5,500 |
- | - | - | - | $42,585 | 8,500 | $(-667) | - | $(-7,680) | - |
- - kWh |
- - kW-months/year |
$42,585 8,500 MMBtu |
$(-667) - $ |
$(-7,680) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $28,806 Cost: $60,000 |
- | - | - | - | $28,806 | 5,750 | - | - | - | - |
- - kWh |
- - kW-months/year |
$28,806 5,750 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $997 Cost: $100 |
$1,061 | 28,516 | $376 | 40 | - | - | $(-200) | - | $(-240) | - |
$1,061 28,516 kWh |
$376 40 kW-months/year |
- - MMBtu |
$(-200) - $ |
$(-240) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $5,045 Cost: $5,000 |
$5,045 | 135,553 | - | - | - | - | - | - | - | - |
$5,045 135,553 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $105,779 Cost: $135,600 |
$6,106 | 164,069 | $376 | 40 | $108,084 | 21,530 | $(-867) | - | $(-7,920) | - | $6,106 164,069 kWh |
$376 40 kW-months/year |
$108,084 21,530 MMBtu |
$(-867) - $ |
$(-7,920) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $35,235 Cost: $5,600 |
$1,061 | 28,516 | $376 | 40 | $42,585 | 8,500 | $(-867) | - | $(-7,920) | - | $1,061 28,516 kWh |
$376 40 kW-months/year |
$42,585 8,500 MMBtu |
$(-867) - $ |
$(-7,920) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |