IAC Assessment: NC0461
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0461
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2012
Principal Product PET resin
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $100,000,000-$500,000,000
# of Employees 87
Plant Area (Sq.Ft.) 230,000
Annual Production 330,000,000 Pounds
Production Hrs. Annual 8,600
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,190,571 71,997,600 kWh $0.04
Electricity Demand $1,034,799 114,584 kW-months/year $9.03
Electricity Fees $47,061 - $ -
Natural Gas $3,960,226 854,285 MMBtu $4.64
TOTAL ENERGY COSTS $8,232,657
RECOMMENDED SAVINGS* $865,407 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $578,202
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2693 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION Savings:
$163,689
Cost:
$410,000
$107,939 2,436,000 $55,750 3,480 - - - - $107,939
2,436,000
kWh
$55,750
3,480
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,912
Cost:
$7,160
$3,746 84,546 - - - - $2,166 - $3,746
84,546
kWh
-
-
kW-months/year
-
-
MMBtu
$2,166
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$81,960
Cost:
$300,000
- - - - $81,960 17,664 - - -
-
kWh
-
-
kW-months/year
$81,960
17,664
MMBtu
-
-
$
04: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$24,541
Cost:
$2,400
- - - - $24,541 5,289 - - -
-
kWh
-
-
kW-months/year
$24,541
5,289
MMBtu
-
-
$
05: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$84,150
Cost:
$40,000
- - - - $84,150 18,136 - - -
-
kWh
-
-
kW-months/year
$84,150
18,136
MMBtu
-
-
$
06: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$4,695
Cost:
-
- - - - $4,695 1,012 - - -
-
kWh
-
-
kW-months/year
$4,695
1,012
MMBtu
-
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$41,556
Cost:
$15,000
- - - - $41,556 8,956 - - -
-
kWh
-
-
kW-months/year
$41,556
8,956
MMBtu
-
-
$
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$458,904
Cost:
$314,375
$431,748 9,743,800 $217,808 13,596 $(-190,652) (-41,089) - - $431,748
9,743,800
kWh
$217,808
13,596
kW-months/year
$(-190,652)
(-41,089)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$865,407
Cost:
$1,088,935
$543,433 12,264,346 $273,558 17,076 $46,250 9,968 $2,166 - $543,433
12,264,346
kWh
$273,558
17,076
kW-months/year
$46,250
9,968
MMBtu
$2,166
-
$
TOTAL IMPLEMENTED Savings:
$578,202
Cost:
$363,935
$435,494 9,828,346 $217,808 13,596 $(-77,266) (-16,652) $2,166 - $435,494
9,828,346
kWh
$217,808
13,596
kW-months/year
$(-77,266)
(-16,652)
MMBtu
$2,166
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost