IAC logo
IAC Assessment: NC0463
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0463
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2012
Principal Product Hardwood flooring
NAICS 321211 - Hardwood Veneer and Plywood Manufacturing
SIC 2436 - Softwood Veneer And Plywood
Sales $10,000,000-$50,000,000
# of Employees 94
Plant Area (Sq.Ft.) 180,000
Annual Production 12,000 Thousand Feet
Production Hrs. Annual 4,576
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $363,595 6,208,000 kWh $0.06
Electricity Demand $80,032 19,520 kW-months/year $4.10
Natural Gas $1,818 132 MMBtu $13.77
TOTAL ENERGY COSTS $445,445
RECOMMENDED SAVINGS* $25,510 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,749
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$15,737
Cost:
$15,000
$15,737 268,560 - - - - - - - - $15,737
268,560
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,159
Cost:
$1,400
$1,834 31,310 $325 79 - - - - - - $1,834
31,310
kWh
$325
79
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,208
Cost:
$200
$2,575 43,968 $473 115 - - $(-600) - $(-240) - $2,575
43,968
kWh
$473
115
kW-months/year
-
-
MMBtu
$(-600)
-
$
$(-240)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,015
Cost:
$1,124
$396 6,760 $38 9 - - $341 - $240 - $396
6,760
kWh
$38
9
kW-months/year
-
-
MMBtu
$341
-
$
$240
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24
Cost:
$135
$3 56 $0 0 - - $14 - $7 - $3
56
kWh
$0
0
kW-months/year
-
-
MMBtu
$14
-
$
$7
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,367
Cost:
$5,000
- - - - $4,367 447 - - - - -
-
kWh
-
-
kW-months/year
$4,367
447
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$25,510
Cost:
$22,859
$20,545 350,654 $836 203 $4,367 447 $(-245) - $7 - $20,545
350,654
kWh
$836
203
kW-months/year
$4,367
447
MMBtu
$(-245)
-
$
$7
-
$
TOTAL IMPLEMENTED Savings:
$9,749
Cost:
$7,724
$4,805 82,038 $836 203 $4,367 447 $(-259) - - - $4,805
82,038
kWh
$836
203
kW-months/year
$4,367
447
MMBtu
$(-259)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost