IAC logo
IAC Assessment: NC0472
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0472
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2012
Principal Product Cycling components
NAICS 336991 - Motorcycle, Bicycle, and Parts Manufacturing
SIC 3751 - Motorcycles, Bicycles, And Parts
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 28,000
Annual Production 15,000 Pieces
Production Hrs. Annual 2,080
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $16,151 311,100 kWh $0.05
Electricity Demand $8,204 960 kW-months/year $8.55
Electricity Fees $2,200 - $ -
Natural Gas $3,672 474 MMBtu $7.75
TOTAL ENERGY COSTS $30,227
RECOMMENDED SAVINGS* $4,704 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,775
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,563
Cost:
$16,950
$1,848 35,599 $1,715 205 - - $1,848
35,599
kWh
$1,715
205
kW-months/year
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$845
Cost:
$1,125
$845 16,270 - - - - $845
16,270
kWh
-
-
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$84
Cost:
$200
$32 610 $30 4 $22 - $32
610
kWh
$30
4
kW-months/year
$22
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$188
Cost:
$50
$154 2,970 $34 4 - - $154
2,970
kWh
$34
4
kW-months/year
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$24
Cost:
-
$24 462 - - - - $24
462
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$4,704
Cost:
$18,325
$2,903 55,911 $1,779 213 $22 - $2,903
55,911
kWh
$1,779
213
kW-months/year
$22
-
$
TOTAL IMPLEMENTED Savings:
$3,775
Cost:
$17,000
$2,026 39,031 $1,749 209 - - $2,026
39,031
kWh
$1,749
209
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost