IAC Assessment: NC0481
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0481
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2013
Principal Product Wood door frames
NAICS 321911 - Wood Window and Door Manufacturing
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 62,992
Annual Production 50,000 Pieces
Production Hrs. Annual 4,500
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $322,176 9,145,880 kWh $0.04
Electricity Demand $414,489 20,881 kW-months/year $19.85
Wood $1 200,000 MMBtu $0.00
TOTAL ENERGY COSTS $736,666
RECOMMENDED SAVINGS* $30,333 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,636
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,338
Cost:
$100
$5,710 159,596 $5,428 259 $(-1,200) - $(-600) - $5,710
159,596
kWh
$5,428
259
kW-months/year
$(-1,200)
-
$
$(-600)
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,603
Cost:
$1,200
$789 22,040 $814 39 - - - - $789
22,040
kWh
$814
39
kW-months/year
-
-
$
-
-
$
03: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$2,363
Cost:
$7,500
$1,182 33,028 $1,181 56 - - - - $1,182
33,028
kWh
$1,181
56
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,333
Cost:
$3,110
$5,671 158,508 $8,852 423 - - $(-190) - $5,671
158,508
kWh
$8,852
423
kW-months/year
-
-
$
$(-190)
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,229
Cost:
$4,819
$480 13,419 $749 36 - - - - $480
13,419
kWh
$749
36
kW-months/year
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$865
Cost:
$955
$206 5,746 $165 8 - - $494 - $206
5,746
kWh
$165
8
kW-months/year
-
-
$
$494
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$602
Cost:
$750
$602 16,830 - - - - - - $602
16,830
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$30,333
Cost:
$18,434
$14,640 409,167 $17,189 821 $(-1,200) - $(-296) - $14,640
409,167
kWh
$17,189
821
kW-months/year
$(-1,200)
-
$
$(-296)
-
$
TOTAL IMPLEMENTED Savings:
$26,636
Cost:
$11,460
$13,165 367,962 $15,461 738 $(-1,200) - $(-790) - $13,165
367,962
kWh
$15,461
738
kW-months/year
$(-1,200)
-
$
$(-790)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost