IAC Assessment: NC0484
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0484
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2013
Principal Product Catalyst modules
NAICS 327110 - Pottery, Ceramics, and Plumbing Fixture Manufacturing
SIC 3269 - Pottery Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 194,500
Annual Production 7,000 Pieces
Production Hrs. Annual 4,950
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,508 2,821,430 kWh $0.06
Electricity Demand $89,988 10,687 kW-months/year $8.42
Natural Gas $422,566 66,538 MMBtu $6.35
TOTAL ENERGY COSTS $671,062
RECOMMENDED SAVINGS* $92,035 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,326
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,304
Cost:
$18,247
$6,070 108,519 $2,252 267 - - - - $(-18) - $6,070
108,519
kWh
$2,252
267
kW-months/year
-
-
MMBtu
-
-
$
$(-18)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,368
Cost:
$54,675
$10,625 189,129 $3,743 444 - - - - - - $10,625
189,129
kWh
$3,743
444
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,283
Cost:
$8,778
$7,283 129,645 - - - - - - - - $7,283
129,645
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,039
Cost:
$1,124
$380 6,760 $78 9 - - - - $581 - $380
6,760
kWh
$78
9
kW-months/year
-
-
MMBtu
-
-
$
$581
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,065
Cost:
$250
$1,442 25,659 $623 74 - - - - - - $1,442
25,659
kWh
$623
74
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$56,670
Cost:
$60,000
- - - - $56,670 8,924 - - - - -
-
kWh
-
-
kW-months/year
$56,670
8,924
MMBtu
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,306
Cost:
$100
$2,308 41,081 $838 99 - - $(-600) - $(-240) - $2,308
41,081
kWh
$838
99
kW-months/year
-
-
MMBtu
$(-600)
-
$
$(-240)
-
$
TOTAL RECOMMENDED Savings:
$92,035
Cost:
$143,174
$28,108 500,793 $7,534 893 $56,670 8,924 $(-600) - $323 - $28,108
500,793
kWh
$7,534
893
kW-months/year
$56,670
8,924
MMBtu
$(-600)
-
$
$323
-
$
TOTAL IMPLEMENTED Savings:
$34,326
Cost:
$82,050
$27,728 494,033 $7,456 884 - - $(-600) - $(-258) - $27,728
494,033
kWh
$7,456
884
kW-months/year
-
-
MMBtu
$(-600)
-
$
$(-258)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost