IAC logo
IAC Assessment: NC0485
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0485
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2013
Principal Product Aircraft maintenance
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $100,000,000-$500,000,000
# of Employees 3,000
Plant Area (Sq.Ft.) 1,460,000
Annual Production 1 Pieces
Production Hrs. Annual 4,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $6,186,024 86,992,315 kWh $0.07
Other Energy $3,600,922 210,950 MMBtu $17.07
TOTAL ENERGY COSTS $9,786,946
RECOMMENDED SAVINGS* $399,219 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $225,167
#|Description Savings
Cost
Status Electricity Usage Other Energy Personnel Changes Ancillary Material Cost Electricity Usage Other Energy Personnel Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$35,649
Cost:
$108,665
$37,810 531,714 - - - - $(-2,161) - $37,810
531,714
kWh
-
-
MMBtu
-
-
$
$(-2,161)
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,016
Cost:
$7,315
$2,016 28,350 - - - - - - $2,016
28,350
kWh
-
-
MMBtu
-
-
$
-
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,647
Cost:
$3,750
$2,647 37,230 - - - - - - $2,647
37,230
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$167,046
Cost:
$6,100
- - $180,046 10,548 $(-1,000) - $(-12,000) - -
-
kWh
$180,046
10,548
MMBtu
$(-1,000)
-
$
$(-12,000)
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,936
Cost:
$300
- - $2,936 172 - - - - -
-
kWh
$2,936
172
MMBtu
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,809
Cost:
$100
$28,009 393,888 - - $(-9,000) - $(-1,200) - $28,009
393,888
kWh
-
-
MMBtu
$(-9,000)
-
$
$(-1,200)
-
$
07: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$148,178
Cost:
$100,000
$148,178 2,084,080 - - - - - - $148,178
2,084,080
kWh
-
-
MMBtu
-
-
$
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$22,938
Cost:
$75,000
- - $22,938 1,344 - - - - -
-
kWh
$22,938
1,344
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$399,219
Cost:
$301,230
$218,660 3,075,262 $205,920 12,064 $(-10,000) - $(-15,361) - $218,660
3,075,262
kWh
$205,920
12,064
MMBtu
$(-10,000)
-
$
$(-15,361)
-
$
TOTAL IMPLEMENTED Savings:
$225,167
Cost:
$125,930
$70,482 991,182 $180,046 10,548 $(-10,000) - $(-15,361) - $70,482
991,182
kWh
$180,046
10,548
MMBtu
$(-10,000)
-
$
$(-15,361)
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Other Energy Personnel Changes Ancillary Material Cost Electricity Usage Other Energy Personnel Changes Ancillary Material Cost