Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2013 |
Principal Product | Aircraft maintenance |
NAICS | 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728 - Aircraft Parts And Equipment, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 3,000 |
Plant Area (Sq.Ft.) | 1,460,000 |
Annual Production | 1 Pieces |
Production Hrs. Annual | 4,400 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $6,186,024 | 86,992,315 | kWh | $0.07 |
Other Energy | $3,600,922 | 210,950 | MMBtu | $17.07 |
TOTAL ENERGY COSTS | $9,786,946 | |||
RECOMMENDED SAVINGS* | $399,219 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $225,167 |
#|Description |
Savings Cost |
Status | Electricity Usage | Other Energy | Personnel Changes | Ancillary Material Cost | Electricity Usage | Other Energy | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $35,649 Cost: $108,665 |
$37,810 | 531,714 | - | - | - | - | $(-2,161) | - |
$37,810 531,714 kWh |
- - MMBtu |
- - $ |
$(-2,161) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,016 Cost: $7,315 |
$2,016 | 28,350 | - | - | - | - | - | - |
$2,016 28,350 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $2,647 Cost: $3,750 |
$2,647 | 37,230 | - | - | - | - | - | - |
$2,647 37,230 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $167,046 Cost: $6,100 |
- | - | $180,046 | 10,548 | $(-1,000) | - | $(-12,000) | - |
- - kWh |
$180,046 10,548 MMBtu |
$(-1,000) - $ |
$(-12,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $2,936 Cost: $300 |
- | - | $2,936 | 172 | - | - | - | - |
- - kWh |
$2,936 172 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $17,809 Cost: $100 |
$28,009 | 393,888 | - | - | $(-9,000) | - | $(-1,200) | - |
$28,009 393,888 kWh |
- - MMBtu |
$(-9,000) - $ |
$(-1,200) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $148,178 Cost: $100,000 |
$148,178 | 2,084,080 | - | - | - | - | - | - |
$148,178 2,084,080 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $22,938 Cost: $75,000 |
- | - | $22,938 | 1,344 | - | - | - | - |
- - kWh |
$22,938 1,344 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $399,219 Cost: $301,230 |
$218,660 | 3,075,262 | $205,920 | 12,064 | $(-10,000) | - | $(-15,361) | - | $218,660 3,075,262 kWh |
$205,920 12,064 MMBtu |
$(-10,000) - $ |
$(-15,361) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $225,167 Cost: $125,930 |
$70,482 | 991,182 | $180,046 | 10,548 | $(-10,000) | - | $(-15,361) | - | $70,482 991,182 kWh |
$180,046 10,548 MMBtu |
$(-10,000) - $ |
$(-15,361) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Other Energy | Personnel Changes | Ancillary Material Cost | Electricity Usage | Other Energy | Personnel Changes | Ancillary Material Cost |