Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2013 |
Principal Product | Fabricated steel |
NAICS | 332311 - Prefabricated Metal Building and Component Manufacturing |
SIC | 3448 - Prefabricated Metal Buildings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 42 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 8,000,000 Pounds |
Production Hrs. Annual | 3,500 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $29,322 | 377,100 | kWh | $0.08 |
Electricity Demand | $1,103 | 1,551 | kW-months/year | $0.71 |
Electricity Fees | $2,536 | - | $ | - |
Natural Gas | $14,844 | 1,725 | MMBtu | $8.61 |
TOTAL ENERGY COSTS | $47,805 | |||
RECOMMENDED SAVINGS* | $6,855 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,353 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,586 Cost: $9,967 |
$3,944 | 48,510 | $557 | 166 | - | - | - | - | $85 | - |
$3,944 48,510 kWh |
$557 166 kW-months/year |
- - MMBtu |
- - $ |
$85 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $143 Cost: $812 |
$126 | 1,544 | $17 | 5 | - | - | - | - | - | - |
$126 1,544 kWh |
$17 5 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $301 Cost: $100 |
$382 | 4,700 | $54 | 16 | - | - | $(-75) | - | $(-60) | - |
$382 4,700 kWh |
$54 16 kW-months/year |
- - MMBtu |
$(-75) - $ |
$(-60) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $323 Cost: $840 |
$192 | 2,365 | $11 | 3 | - | - | $120 | - | - | - |
$192 2,365 kWh |
$11 3 kW-months/year |
- - MMBtu |
$120 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $736 Cost: $1,200 |
- | - | - | - | $736 | 86 | - | - | - | - |
- - kWh |
- - kW-months/year |
$736 86 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $564 Cost: $1,325 |
$544 | 6,699 | $20 | 6 | - | - | - | - | - | - |
$544 6,699 kWh |
$20 6 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $202 Cost: $50 |
$90 | 1,101 | $112 | 34 | - | - | - | - | - | - |
$90 1,101 kWh |
$112 34 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $6,855 Cost: $14,294 |
$5,278 | 64,919 | $771 | 230 | $736 | 86 | $45 | - | $25 | - | $5,278 64,919 kWh |
$771 230 kW-months/year |
$736 86 MMBtu |
$45 - $ |
$25 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,353 Cost: $11,719 |
$4,644 | 57,119 | $639 | 190 | - | - | $45 | - | $25 | - | $4,644 57,119 kWh |
$639 190 kW-months/year |
- - MMBtu |
$45 - $ |
$25 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |