IAC Assessment: NC0487
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0487
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2013
Principal Product Fabricated steel
NAICS 332311 - Prefabricated Metal Building and Component Manufacturing
SIC 3448 - Prefabricated Metal Buildings
Sales $10,000,000-$50,000,000
# of Employees 42
Plant Area (Sq.Ft.) 50,000
Annual Production 8,000,000 Pounds
Production Hrs. Annual 3,500
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,322 377,100 kWh $0.08
Electricity Demand $1,103 1,551 kW-months/year $0.71
Electricity Fees $2,536 - $ -
Natural Gas $14,844 1,725 MMBtu $8.61
TOTAL ENERGY COSTS $47,805
RECOMMENDED SAVINGS* $6,855 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,353
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,586
Cost:
$9,967
$3,944 48,510 $557 166 - - - - $85 - $3,944
48,510
kWh
$557
166
kW-months/year
-
-
MMBtu
-
-
$
$85
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$143
Cost:
$812
$126 1,544 $17 5 - - - - - - $126
1,544
kWh
$17
5
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$301
Cost:
$100
$382 4,700 $54 16 - - $(-75) - $(-60) - $382
4,700
kWh
$54
16
kW-months/year
-
-
MMBtu
$(-75)
-
$
$(-60)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$323
Cost:
$840
$192 2,365 $11 3 - - $120 - - - $192
2,365
kWh
$11
3
kW-months/year
-
-
MMBtu
$120
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$736
Cost:
$1,200
- - - - $736 86 - - - - -
-
kWh
-
-
kW-months/year
$736
86
MMBtu
-
-
$
-
-
$
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$564
Cost:
$1,325
$544 6,699 $20 6 - - - - - - $544
6,699
kWh
$20
6
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$202
Cost:
$50
$90 1,101 $112 34 - - - - - - $90
1,101
kWh
$112
34
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$6,855
Cost:
$14,294
$5,278 64,919 $771 230 $736 86 $45 - $25 - $5,278
64,919
kWh
$771
230
kW-months/year
$736
86
MMBtu
$45
-
$
$25
-
$
TOTAL IMPLEMENTED Savings:
$5,353
Cost:
$11,719
$4,644 57,119 $639 190 - - $45 - $25 - $4,644
57,119
kWh
$639
190
kW-months/year
-
-
MMBtu
$45
-
$
$25
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost