IAC logo
IAC Assessment: NC0492
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0492
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2013
Principal Product Curtains and household textiles
NAICS 314120 - Curtain and Linen Mills
SIC 2392 - Housefurnishings, Nec
Sales $50,000,000-$100,000,000
# of Employees 164
Plant Area (Sq.Ft.) 394,028
Annual Production 30,000,000 Pieces
Production Hrs. Annual 2,250
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $112,634 2,156,470 kWh $0.05
Electricity Demand $60,615 7,069 kW-months/year $8.57
Electricity Fees $8,516 - $ -
Natural Gas $38,736 4,504 MMBtu $8.60
TOTAL ENERGY COSTS $220,501
RECOMMENDED SAVINGS* $38,677 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,180
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$8,471
Cost:
$13,495
$8,471 158,784 - - - - - - $8,471
158,784
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$6,492
Cost:
$1,140
$2,984 55,935 $2,492 299 - - $1,016 - $2,984
55,935
kWh
$2,492
299
kW-months/year
-
-
MMBtu
$1,016
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$259
Cost:
$250
$127 2,376 $132 16 - - - - $127
2,376
kWh
$132
16
kW-months/year
-
-
MMBtu
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,869
Cost:
$100
- - $1,869 224 - - - - -
-
kWh
$1,869
224
kW-months/year
-
-
MMBtu
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$688
Cost:
-
- - $688 80 - - - - -
-
kWh
$688
80
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$20,838
Cost:
$12,000
$14,709 275,711 $4,237 511 $1,892 220 - - $14,709
275,711
kWh
$4,237
511
kW-months/year
$1,892
220
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$60
Cost:
$90
$32 605 $28 3 - - - - $32
605
kWh
$28
3
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$38,677
Cost:
$27,075
$26,323 493,411 $9,446 1,133 $1,892 220 $1,016 - $26,323
493,411
kWh
$9,446
1,133
kW-months/year
$1,892
220
MMBtu
$1,016
-
$
TOTAL IMPLEMENTED Savings:
$7,180
Cost:
$1,140
$2,984 55,935 $3,180 379 - - $1,016 - $2,984
55,935
kWh
$3,180
379
kW-months/year
-
-
MMBtu
$1,016
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost