Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2013 |
Principal Product | HEPA filters |
NAICS | 333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
SIC | 3564 - Blowers And Fans |
Sales | $10,000,000-$50,000,000 |
# of Employees | 500 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 100,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $394,998 | 6,250,650 | kWh | $0.06 |
Electricity Demand | $78,262 | 16,446 | kW-months/year | $4.76 |
Electricity Fees | $4,492 | - | $ | - |
Natural Gas | $95,130 | 12,323 | MMBtu | $7.72 |
TOTAL ENERGY COSTS | $763,421 | |||
RECOMMENDED SAVINGS* | $45,465 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $41,640 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $15,740 Cost: $70,400 |
$7,167 | 113,400 | $12,120 | 600 | $(-3,547) | (-483) | - | - | - | - |
$7,167 113,400 kWh |
$12,120 600 kW-months/year |
$(-3,547) (-483) MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,761 Cost: $100 |
$1,697 | 26,856 | $904 | 45 | - | - | $(-600) | - | $(-240) | - |
$1,697 26,856 kWh |
$904 45 kW-months/year |
- - MMBtu |
$(-600) - $ |
$(-240) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,793 Cost: $2,250 |
- | - | - | - | $1,793 | 244 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,793 244 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,827 Cost: $11,647 |
$3,149 | 49,831 | $1,678 | 83 | - | - | - | - | - | - |
$3,149 49,831 kWh |
$1,678 83 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $13,386 Cost: $2,785 |
$13,386 | 211,805 | - | - | - | - | - | - | - | - |
$13,386 211,805 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $2,032 Cost: $120 |
$543 | 8,596 | $1,489 | 74 | - | - | - | - | - | - |
$543 8,596 kWh |
$1,489 74 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,053 Cost: $513 |
$1,103 | 17,454 | $759 | 38 | - | - | - | - | $191 | - |
$1,103 17,454 kWh |
$759 38 kW-months/year |
- - MMBtu |
- - $ |
$191 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $3,513 Cost: $4,256 |
$2,292 | 36,266 | $1,221 | 60 | - | - | - | - | - | - |
$2,292 36,266 kWh |
$1,221 60 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM |
Savings: $360 Cost: $650 |
$328 | 5,184 | $32 | 9 | - | - | - | - | - | - |
$328 5,184 kWh |
$32 9 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $45,465 Cost: $92,721 |
$29,665 | 469,392 | $18,203 | 909 | $(-1,754) | (-239) | $(-600) | - | $(-49) | - | $29,665 469,392 kWh |
$18,203 909 kW-months/year |
$(-1,754) (-239) MMBtu |
$(-600) - $ |
$(-49) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $41,640 Cost: $90,351 |
$29,122 | 460,796 | $16,714 | 835 | $(-3,547) | (-483) | $(-600) | - | $(-49) | - | $29,122 460,796 kWh |
$16,714 835 kW-months/year |
$(-3,547) (-483) MMBtu |
$(-600) - $ |
$(-49) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |