IAC Assessment: NC0503
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0503
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2013
Principal Product Vinyl windows
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $100,000,000-$500,000,000
# of Employees 600
Plant Area (Sq.Ft.) 312,960
Annual Production 875,000 Pieces
Production Hrs. Annual 5,125
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $660,308 7,201,800 kWh $0.09
Electricity Demand $144,388 18,036 kW-months/year $8.01
Natural Gas $28,305 3,320 MMBtu $8.53
TOTAL ENERGY COSTS $833,001
RECOMMENDED SAVINGS* $278,584 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,203
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$128,043
Cost:
$171,848
$110,234 1,202,376 $19,251 2,404 - - - - $(-1,442) - $110,234
1,202,376
kWh
$19,251
2,404
kW-months/year
-
-
MMBtu
-
-
$
$(-1,442)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,179
Cost:
$7,472
$6,111 66,660 $1,068 133 - - - - - - $6,111
66,660
kWh
$1,068
133
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$16,865
Cost:
$10,990
$16,865 183,955 - - - - - - - - $16,865
183,955
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$107,579
Cost:
$110,000
$133,205 1,452,938 $27,233 3,400 $(-52,859) (-6,197) - - - - $133,205
1,452,938
kWh
$27,233
3,400
kW-months/year
$(-52,859)
(-6,197)
MMBtu
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,771
Cost:
$1,900
- - - - $7,771 911 - - - - -
-
kWh
-
-
kW-months/year
$7,771
911
MMBtu
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,944
Cost:
$3,969
$8,270 90,200 $1,674 209 - - - - - - $8,270
90,200
kWh
$1,674
209
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,203
Cost:
$100
$1,447 15,785 $296 37 - - $(-300) - $(-240) - $1,447
15,785
kWh
$296
37
kW-months/year
-
-
MMBtu
$(-300)
-
$
$(-240)
-
$
TOTAL RECOMMENDED Savings:
$278,584
Cost:
$306,279
$276,132 3,011,914 $49,522 6,183 $(-45,088) (-5,286) $(-300) - $(-1,682) - $276,132
3,011,914
kWh
$49,522
6,183
kW-months/year
$(-45,088)
(-5,286)
MMBtu
$(-300)
-
$
$(-1,682)
-
$
TOTAL IMPLEMENTED Savings:
$1,203
Cost:
$100
$1,447 15,785 $296 37 - - $(-300) - $(-240) - $1,447
15,785
kWh
$296
37
kW-months/year
-
-
MMBtu
$(-300)
-
$
$(-240)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost