Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2014 |
Principal Product | Manufactured Homes |
NAICS | 321991 - Manufactured Home (Mobile Home) Manufacturing |
SIC | 2451 - Mobile Homes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 101 |
Plant Area (Sq.Ft.) | 95,000 |
Annual Production | 200 Pieces |
Production Hrs. Annual | 2,125 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $66,592 | 782,500 | kWh | $0.09 |
Electricity Demand | $11,214 | 3,115 | kW-months/year | $3.60 |
Electricity Fees | $4,411 | - | $ | - |
LPG | $52,534 | 1,917 | MMBtu | $27.40 |
TOTAL ENERGY COSTS | $134,751 | |||
RECOMMENDED SAVINGS* | $23,503 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,222 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | LPG | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE |
Savings: $9,684 Cost: $2,200 |
- | - | - | - | $9,684 | 501 | - | - | - | - |
- - kWh |
- - kW-months/year |
$9,684 501 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $865 Cost: $100 |
$1,134 | 13,324 | $271 | 63 | - | - | $(-300) | - | $(-240) | - |
$1,134 13,324 kWh |
$271 63 kW-months/year |
- - MMBtu |
$(-300) - $ |
$(-240) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,274 Cost: $1,950 |
$1,028 | 12,084 | $246 | 68 | - | - | - | - | - | - |
$1,028 12,084 kWh |
$246 68 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,952 Cost: $2,300 |
- | - | - | - | $1,952 | 101 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,952 101 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,695 Cost: $28,977 |
$5,469 | 64,262 | $1,303 | 363 | - | - | - | - | $(-77) | - |
$5,469 64,262 kWh |
$1,303 363 kW-months/year |
- - MMBtu |
- - $ |
$(-77) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $520 Cost: $4,006 |
$423 | 4,976 | $97 | 26 | - | - | - | - | - | - |
$423 4,976 kWh |
$97 26 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,026 Cost: $240 |
$546 | 5,413 | $31 | 9 | - | - | - | - | $449 | - |
$546 5,413 kWh |
$31 9 kW-months/year |
- - MMBtu |
- - $ |
$449 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $359 Cost: $574 |
$359 | 4,219 | - | - | - | - | - | - | - | - |
$359 4,219 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $1,128 Cost: $4,256 |
$911 | 10,703 | $217 | 60 | - | - | - | - | - | - |
$911 10,703 kWh |
$217 60 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $23,503 Cost: $44,603 |
$9,870 | 114,981 | $2,165 | 589 | $11,636 | 602 | $(-300) | - | $132 | - | $9,870 114,981 kWh |
$2,165 589 kW-months/year |
$11,636 602 MMBtu |
$(-300) - $ |
$132 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,222 Cost: $33,817 |
$7,149 | 82,999 | $1,605 | 435 | $11,636 | 602 | $(-300) | - | $132 | - | $7,149 82,999 kWh |
$1,605 435 kW-months/year |
$11,636 602 MMBtu |
$(-300) - $ |
$132 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | LPG | Personnel Changes | Ancillary Material Cost |