Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2014 |
Principal Product | Metal stampings |
NAICS | 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
SIC | 3469 - Metal Stampings, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 78 |
Plant Area (Sq.Ft.) | 130,000 |
Annual Production | 1,000,000 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $296,138 | 3,030,767 | kWh | $0.10 |
Electricity Demand | $49,590 | 6,402 | kW-months/year | $7.75 |
Electricity Fees | $1,419 | - | $ | - |
Natural Gas | $67,875 | 5,880 | MMBtu | $11.54 |
TOTAL ENERGY COSTS | $415,022 | |||
RECOMMENDED SAVINGS* | $112,048 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION |
Savings: $53,232 Cost: $125,000 |
$(-82,068) | (-840,000) | $(-9,300) | (-1,200) | - | - | - | - | $(-2,400) | - | $147,000 | - |
$(-82,068) (-840,000) kWh |
$(-9,300) (-1,200) kW-months/year |
- - MMBtu |
- - $ |
$(-2,400) - $ |
$147,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $29,302 Cost: $53,000 |
$26,326 | 269,455 | $2,976 | 384 | - | - | - | - | - | - | - | - |
$26,326 269,455 kWh |
$2,976 384 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $7,743 Cost: $450 |
- | - | - | - | $7,743 | 671 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,743 671 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,802 Cost: $50 |
$4,314 | 44,151 | $488 | 63 | - | - | - | - | - | - | - | - |
$4,314 44,151 kWh |
$488 63 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,307 Cost: $5,081 |
$3,105 | 31,781 | $355 | 46 | - | - | - | - | - | - | $(-153) | - |
$3,105 31,781 kWh |
$355 46 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
$(-153) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $11,995 Cost: $2,335 |
$11,995 | 122,774 | - | - | - | - | - | - | - | - | - | - |
$11,995 122,774 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,667 Cost: $100 |
$1,838 | 18,816 | $209 | 27 | - | - | $(-300) | - | - | - | $(-80) | - |
$1,838 18,816 kWh |
$209 27 kW-months/year |
- - MMBtu |
$(-300) - $ |
- - $ |
$(-80) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $112,048 Cost: $186,016 |
$(-34,490) | (-353,023) | $(-5,272) | (-680) | $7,743 | 671 | $(-300) | - | $(-2,400) | - | $146,767 | - | $(-34,490) (-353,023) kWh |
$(-5,272) (-680) kW-months/year |
$7,743 671 MMBtu |
$(-300) - $ |
$(-2,400) - $ |
$146,767 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost |