Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2014
Principal Product Plywood
NAICS 321211 - Hardwood Veneer and Plywood Manufacturing
SIC 2435 - Hardwood Veneer And Plywood
Sales $50,000,000-$100,000,000
# of Employees 120
Plant Area (Sq.Ft.) 200,000
Annual Production 130,000 Thousand Feet
Production Hrs. Annual 7,200
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,079,904 21,792,167 kWh $0.05
Electricity Demand $453,878 39,619 kW-months/year $11.46
Natural Gas $8,127 926 MMBtu $8.78
Wood $1 283,995 MMBtu $0.00
TOTAL ENERGY COSTS $1,541,910
RECOMMENDED SAVINGS* $164,852 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,361
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$16,691
Cost:
$50
$12,645 245,532 $4,046 351 - - - - $12,645
245,532
kWh
$4,046
351
kW-months/year
-
-
$
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$8,621
Cost:
-
$8,621 167,405 - - - - - - $8,621
167,405
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$16,504
Cost:
$22,000
$16,504 320,481 - - - - - - $16,504
320,481
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$11,341
Cost:
$100
$11,341 220,219 - - - - - - $11,341
220,219
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$14,361
Cost:
$100
$12,722 247,021 $4,039 353 $(-1,600) - $(-800) - $12,722
247,021
kWh
$4,039
353
kW-months/year
$(-1,600)
-
$
$(-800)
-
$
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$36,114
Cost:
$73,589
$26,345 511,650 $9,769 853 - - - - $26,345
511,650
kWh
$9,769
853
kW-months/year
-
-
$
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$35,127
Cost:
$9,720
$25,630 497,664 $9,497 829 - - - - $25,630
497,664
kWh
$9,497
829
kW-months/year
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,636
Cost:
$43,944
$17,984 349,207 $6,648 581 - - $4 - $17,984
349,207
kWh
$6,648
581
kW-months/year
-
-
$
$4
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$375
Cost:
$1,605
$274 5,314 $101 9 - - - - $274
5,314
kWh
$101
9
kW-months/year
-
-
$
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$642
Cost:
$944
$642 12,474 - - - - - - $642
12,474
kWh
-
-
kW-months/year
-
-
$
-
-
$
11: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$440
Cost:
$560
$207 4,028 $233 20 - - - - $207
4,028
kWh
$233
20
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$164,852
Cost:
$152,612
$132,915 2,580,995 $34,333 2,996 $(-1,600) - $(-796) - $132,915
2,580,995
kWh
$34,333
2,996
kW-months/year
$(-1,600)
-
$
$(-796)
-
$
TOTAL IMPLEMENTED Savings:
$14,361
Cost:
$100
$12,722 247,021 $4,039 353 $(-1,600) - $(-800) - $12,722
247,021
kWh
$4,039
353
kW-months/year
$(-1,600)
-
$
$(-800)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost