IAC logo
IAC Assessment: NC0515
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0515
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2014
Principal Product High voltage cable
NAICS 335929 - Other Communication and Energy Wire Manufacturing
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $50,000,000-$100,000,000
# of Employees 120
Plant Area (Sq.Ft.) 303,281
Annual Production 1,970 Thousand Feet
Production Hrs. Annual 8,400
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $350,803 10,726,394 kWh $0.03
Electricity Demand $130,036 20,074 kW-months/year $6.48
Electricity Fees $(-70,781) - $ -
Natural Gas $57,583 6,356 MMBtu $9.06
TOTAL ENERGY COSTS $467,641
RECOMMENDED SAVINGS* $40,582 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$26,905
Cost:
$50,000
$(-7,663) (-234,346) $(-3,032) (-469) - - $(-2,400) - $40,000 - $(-7,663)
(-234,346)
kWh
$(-3,032)
(-469)
kW-months/year
-
-
MMBtu
$(-2,400)
-
$
$40,000
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,351
Cost:
$1,591
$3,351 102,464 - - - - - - - - $3,351
102,464
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,741
Cost:
$7,000
$1,741 53,246 - - - - - - - - $1,741
53,246
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$66
Cost:
$25
$30 924 $17 3 - - - - $19 - $30
924
kWh
$17
3
kW-months/year
-
-
MMBtu
-
-
$
$19
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$165
Cost:
$160
$165 5,040 - - - - - - - - $165
5,040
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$390
Cost:
$990
$64 1,944 $67 11 - - - - $259 - $64
1,944
kWh
$67
11
kW-months/year
-
-
MMBtu
-
-
$
$259
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,104
Cost:
$12,169
$1,705 52,135 $710 110 - - - - $689 - $1,705
52,135
kWh
$710
110
kW-months/year
-
-
MMBtu
-
-
$
$689
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,554
Cost:
$5,000
$1,830 55,950 $724 112 - - - - - - $1,830
55,950
kWh
$724
112
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,306
Cost:
$5,000
- - - - $2,306 255 - - - - -
-
kWh
-
-
kW-months/year
$2,306
255
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$40,582
Cost:
$81,935
$1,223 37,357 $(-1,514) (-233) $2,306 255 $(-2,400) - $40,967 - $1,223
37,357
kWh
$(-1,514)
(-233)
kW-months/year
$2,306
255
MMBtu
$(-2,400)
-
$
$40,967
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost