IAC Assessment: NC0516
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0516
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2014
Principal Product Injection molded plastic parts
NAICS 326121 - Unlaminated Plastics Profile Shape Manufacturing
SIC 3082 - Unsupported Plastics Profile Shapes
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 44,341
Annual Production 157,000,000 Pieces
Production Hrs. Annual 7,200
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $115,480 2,740,035 kWh $0.04
Electricity Demand $59,318 5,453 kW-months/year $10.88
TOTAL ENERGY COSTS $174,798
RECOMMENDED SAVINGS* $19,944 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,104
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,076
Cost:
$24,656
$8,438 200,421 $3,638 335 - - - - $8,438
200,421
kWh
$3,638
335
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,207
Cost:
$1,497
$579 13,754 $628 58 - - - - $579
13,754
kWh
$628
58
kW-months/year
-
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$218
Cost:
$75
$145 3,456 $63 6 - - $10 - $145
3,456
kWh
$63
6
kW-months/year
-
-
$
$10
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$272
Cost:
$80
$90 2,138 $32 3 - - $150 - $90
2,138
kWh
$32
3
kW-months/year
-
-
$
$150
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$587
Cost:
$1,594
$587 13,934 - - - - - - $587
13,934
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$1,840
Cost:
$8,000
$1,430 33,961 $410 38 - - - - $1,430
33,961
kWh
$410
38
kW-months/year
-
-
$
-
-
$
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$2,479
Cost:
$5,500
$2,479 58,881 - - - - - - $2,479
58,881
kWh
-
-
kW-months/year
-
-
$
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$798
Cost:
$50
$558 13,248 $240 22 - - - - $558
13,248
kWh
$240
22
kW-months/year
-
-
$
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$467
Cost:
$50
$452 10,742 $195 18 $(-100) - $(-80) - $452
10,742
kWh
$195
18
kW-months/year
$(-100)
-
$
$(-80)
-
$
TOTAL RECOMMENDED Savings:
$19,944
Cost:
$41,502
$14,758 350,535 $5,206 480 $(-100) - $80 - $14,758
350,535
kWh
$5,206
480
kW-months/year
$(-100)
-
$
$80
-
$
TOTAL IMPLEMENTED Savings:
$18,104
Cost:
$33,502
$13,328 316,574 $4,796 442 $(-100) - $80 - $13,328
316,574
kWh
$4,796
442
kW-months/year
$(-100)
-
$
$80
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost