Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2015 |
Principal Product | Organic peroxides |
NAICS | 325199 - All Other Basic Organic Chemical Manufacturing |
SIC | 2869 - Industrial Organic Chemicals, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 16 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 4,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $178,277 | 2,875,436 | kWh | $0.06 |
Other Energy | $285,156 | 43,661 | MMBtu | $6.53 |
TOTAL ENERGY COSTS | $463,433 | |||
RECOMMENDED SAVINGS* | $137,889 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Other Energy | Personnel Changes | Ancillary Material Cost | Electricity Usage | Other Energy | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2161 OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS |
Savings: $88,496 Cost: $300,000 |
$(-47,270) | (-762,412) | $145,766 | 22,319 | - | - | $(-10,000) | - |
$(-47,270) (-762,412) kWh |
$145,766 22,319 MMBtu |
- - $ |
$(-10,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $15,080 Cost: $10,000 |
$15,080 | 248,220 | - | - | - | - | - | - |
$15,080 248,220 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $12,195 Cost: $9,000 |
$4,720 | 76,127 | - | - | - | - | $7,475 | - |
$4,720 76,127 kWh |
- - MMBtu |
- - $ |
$7,475 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,004 Cost: $100 |
$4,733 | 76,345 | - | - | $(-600) | - | $3,871 | - |
$4,733 76,345 kWh |
- - MMBtu |
$(-600) - $ |
$3,871 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,199 Cost: $15,557 |
$5,222 | 84,219 | - | - | - | - | $977 | - |
$5,222 84,219 kWh |
- - MMBtu |
- - $ |
$977 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,475 Cost: $347 |
$2,031 | 32,762 | - | - | - | - | $1,444 | - |
$2,031 32,762 kWh |
- - MMBtu |
- - $ |
$1,444 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,618 Cost: $1,873 |
$2,889 | 46,603 | - | - | - | - | $(-1,271) | - |
$2,889 46,603 kWh |
- - MMBtu |
- - $ |
$(-1,271) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $314 Cost: $206 |
$289 | 4,669 | - | - | - | - | $25 | - |
$289 4,669 kWh |
- - MMBtu |
- - $ |
$25 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $2,508 Cost: $351 |
- | - | $2,508 | 384 | - | - | - | - |
- - kWh |
$2,508 384 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $137,889 Cost: $337,434 |
$(-12,306) | (-193,467) | $148,274 | 22,703 | $(-600) | - | $2,521 | - | $(-12,306) (-193,467) kWh |
$148,274 22,703 MMBtu |
$(-600) - $ |
$2,521 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Other Energy | Personnel Changes | Ancillary Material Cost | Electricity Usage | Other Energy | Personnel Changes | Ancillary Material Cost |