Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2015 |
Principal Product | Reprocessed oil/glycol |
NAICS | 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899 - Chemical Preparations, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 23 |
Plant Area (Sq.Ft.) | 10,000 |
Annual Production | 1,000 Thousand Gallons |
Production Hrs. Annual | 6,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $6,228 | 90,678 | kWh | $0.07 |
Electricity Demand | $3,592 | 735 | kW-months/year | $4.89 |
Fuel Oil #4 | $91,216 | 5,676 | MMBtu | $16.07 |
TOTAL ENERGY COSTS | $101,036 | |||
RECOMMENDED SAVINGS* | $17,142 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $14,447 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #4 | Personnel Changes | Ancillary Material Cost | Electricity Usage | Fuel Oil #4 | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $6,900 Cost: $3,517 |
- | - | $6,900 | 429 | - | - | - | - |
- - kWh |
$6,900 429 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1232 KEEP BOILER TUBES CLEAN |
Savings: $3,889 Cost: $2,000 |
- | - | $3,889 | 242 | - | - | - | - |
- - kWh |
$3,889 242 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $2,085 Cost: $4,526 |
$2,085 | 30,221 | - | - | - | - | - | - |
$2,085 30,221 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $1,453 Cost: $500 |
$1,453 | - | - | - | - | - | - | - |
$1,453 - kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,189 Cost: $3,822 |
$1,139 | 16,506 | - | - | - | - | $50 | - |
$1,139 16,506 kWh |
- - MMBtu |
- - $ |
$50 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $1,216 Cost: $2,500 |
- | - | $1,216 | 76 | - | - | - | - |
- - kWh |
$1,216 76 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $357 Cost: $100 |
$517 | 7,487 | - | - | $(-100) | - | $(-60) | - |
$517 7,487 kWh |
- - MMBtu |
$(-100) - $ |
$(-60) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $53 Cost: $200 |
$53 | 770 | - | - | - | - | - | - |
$53 770 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $17,142 Cost: $17,165 |
$5,247 | 54,984 | $12,005 | 747 | $(-100) | - | $(-10) | - | $5,247 54,984 kWh |
$12,005 747 MMBtu |
$(-100) - $ |
$(-10) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $14,447 Cost: $12,643 |
$2,602 | 37,708 | $12,005 | 747 | $(-100) | - | $(-60) | - | $2,602 37,708 kWh |
$12,005 747 MMBtu |
$(-100) - $ |
$(-60) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #4 | Personnel Changes | Ancillary Material Cost | Electricity Usage | Fuel Oil #4 | Personnel Changes | Ancillary Material Cost |