Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2016 |
Principal Product | Conveyor belts |
NAICS | 326220 - Rubber and Plastics Hoses and Belting Manufacturing |
SIC | 3052 - Rubber & Plastics Hose & Belting |
Sales | $10,000,000-$50,000,000 |
# of Employees | 39 |
Plant Area (Sq.Ft.) | 117,500 |
Annual Production | 800,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $166,255 | 2,999,054 | kWh | $0.06 |
Electricity Demand | $99,309 | 11,944 | kW-months/year | $8.31 |
Natural Gas | $122,390 | 16,248 | MMBtu | $7.53 |
TOTAL ENERGY COSTS | $387,954 | |||
RECOMMENDED SAVINGS* | $74,209 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $8,449 Cost: $20,000 |
- | - | - | - | $8,449 | 1,122 | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,449 1,122 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $512 Cost: $450 |
$42 | 750 | $266 | 30 | $204 | 27 | - | - | - | - |
$42 750 kWh |
$266 30 kW-months/year |
$204 27 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $17,784 Cost: $500 |
$17,784 | - | - | - | - | - | - | - | - | - |
$17,784 - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $9,933 Cost: $34,000 |
$7,554 | 134,417 | $2,379 | 269 | - | - | - | - | - | - |
$7,554 134,417 kWh |
$2,379 269 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $3,805 Cost: $10,500 |
$205 | 3,645 | $3,600 | 407 | - | - | - | - | - | - |
$205 3,645 kWh |
$3,600 407 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,968 Cost: $5,000 |
- | - | - | - | $3,968 | 527 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,968 527 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,126 Cost: $200 |
$1,388 | 24,703 | $438 | 49 | - | - | $(-300) | - | $(-400) | - |
$1,388 24,703 kWh |
$438 49 kW-months/year |
- - MMBtu |
$(-300) - $ |
$(-400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION |
Savings: $4,233 Cost: $20,700 |
$4,233 | 75,317 | - | - | - | - | - | - | - | - |
$4,233 75,317 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $764 Cost: $431 |
- | - | - | - | $764 | 101 | - | - | - | - |
- - kWh |
- - kW-months/year |
$764 101 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $288 Cost: $70 |
$136 | 2,420 | $129 | 15 | - | - | - | - | $23 | - |
$136 2,420 kWh |
$129 15 kW-months/year |
- - MMBtu |
- - $ |
$23 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,001 Cost: $26,800 |
$6,733 | 119,796 | $2,120 | 240 | - | - | - | - | $1,148 | - |
$6,733 119,796 kWh |
$2,120 240 kW-months/year |
- - MMBtu |
- - $ |
$1,148 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,394 Cost: $521 |
$1,394 | 24,792 | - | - | - | - | - | - | - | - |
$1,394 24,792 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,483 Cost: $19,695 |
$2,499 | 44,460 | $787 | 89 | - | - | - | - | $1,197 | - |
$2,499 44,460 kWh |
$787 89 kW-months/year |
- - MMBtu |
- - $ |
$1,197 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,028 Cost: $6,967 |
$1,155 | 20,544 | $533 | 60 | - | - | - | - | $340 | - |
$1,155 20,544 kWh |
$533 60 kW-months/year |
- - MMBtu |
- - $ |
$340 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $547 Cost: $1,540 |
$452 | 8,042 | - | - | - | - | - | - | $95 | - |
$452 8,042 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$95 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $710 Cost: $192 |
$288 | 5,130 | $63 | 7 | - | - | - | - | $359 | - |
$288 5,130 kWh |
$63 7 kW-months/year |
- - MMBtu |
- - $ |
$359 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $93 Cost: $200 |
$93 | 1,650 | - | - | - | - | - | - | - | - |
$93 1,650 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $2,232 Cost: $4,256 |
$1,698 | 30,214 | $534 | 60 | - | - | - | - | - | - |
$1,698 30,214 kWh |
$534 60 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
19: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,859 Cost: $230 |
$1,414 | 25,154 | $445 | 50 | - | - | - | - | - | - |
$1,414 25,154 kWh |
$445 50 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $74,209 Cost: $152,252 |
$47,068 | 521,034 | $11,294 | 1,276 | $13,385 | 1,777 | $(-300) | - | $2,762 | - | $47,068 521,034 kWh |
$11,294 1,276 kW-months/year |
$13,385 1,777 MMBtu |
$(-300) - $ |
$2,762 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |