IAC logo
IAC Assessment: NC0567
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0567
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2016
Principal Product Water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 75,000
Annual Production 2,200,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $224,376 5,415,642 kWh $0.04
Electricity Demand $129,999 11,940 kW-months/year $10.89
Electricity Fees $(-11,979) - $ -
Natural Gas $16,835 2,158 MMBtu $7.80
TOTAL ENERGY COSTS $359,231
RECOMMENDED SAVINGS* $63,618 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,422
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,225
Cost:
$500
- - $2,225 280 - - -
-
kWh
$2,225
280
kW-months/year
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$15,323
Cost:
$500
- - $15,323 1,392 - - -
-
kWh
$15,323
1,392
kW-months/year
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$21,630
Cost:
$500
$21,630 - - - - - $21,630
-
kWh
-
-
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,573
Cost:
$24,432
$2,234 53,822 $1,756 163 $583 - $2,234
53,822
kWh
$1,756
163
kW-months/year
$583
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,671
Cost:
$4,410
$2,563 61,758 $910 85 $198 - $2,563
61,758
kWh
$910
85
kW-months/year
$198
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$410
Cost:
$868
$410 9,886 - - - - $410
9,886
kWh
-
-
kW-months/year
-
-
$
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$45
Cost:
$160
$45 1,080 - - - - $45
1,080
kWh
-
-
kW-months/year
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,741
Cost:
$200,000
$11,472 277,108 $4,269 380 - - $11,472
277,108
kWh
$4,269
380
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$63,618
Cost:
$231,370
$38,354 403,654 $24,483 2,300 $781 - $38,354
403,654
kWh
$24,483
2,300
kW-months/year
$781
-
$
TOTAL IMPLEMENTED Savings:
$47,422
Cost:
$30,342
$26,427 115,580 $20,214 1,920 $781 - $26,427
115,580
kWh
$20,214
1,920
kW-months/year
$781
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost