IAC logo
IAC Assessment: NC0572
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0572
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2016
Principal Product Aluminum extrusions
NAICS 331318 - Other Aluminum Rolling, Drawing, and Extruding
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 195,000
Annual Production 30,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $631,150 8,188,064 kWh $0.08
Natural Gas $116,596 39,716 MMBtu $2.94
TOTAL ENERGY COSTS $747,746
RECOMMENDED SAVINGS* $42,259 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,065
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Ancillary Material Cost Electricity Usage Personnel Changes Ancillary Material Cost
$ kWh $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,828
Cost:
$21,764
$10,418 135,289 - - $1,410 - $10,418
135,289
kWh
-
-
$
$1,410
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,293
Cost:
$35,726
$7,782 101,070 - - $1,511 - $7,782
101,070
kWh
-
-
$
$1,511
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,850
Cost:
$150
$2,850 37,011 - - - - $2,850
37,011
kWh
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,443
Cost:
$12,240
$2,169 28,172 - - $274 - $2,169
28,172
kWh
-
-
$
$274
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$307
Cost:
$571
$307 3,986 - - - - $307
3,986
kWh
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$944
Cost:
$200
$1,294 16,800 $(-150) - $(-200) - $1,294
16,800
kWh
$(-150)
-
$
$(-200)
-
$
07: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$11,387
Cost:
$100
$11,387 147,887 - - - - $11,387
147,887
kWh
-
-
$
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$117
Cost:
$180
$117 1,522 - - - - $117
1,522
kWh
-
-
$
-
-
$
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,418
Cost:
$5,865
$2,418 31,406 - - - - $2,418
31,406
kWh
-
-
$
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$672
Cost:
$103
$672 8,718 - - - - $672
8,718
kWh
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$42,259
Cost:
$76,899
$39,414 511,861 $(-150) - $2,995 - $39,414
511,861
kWh
$(-150)
-
$
$2,995
-
$
TOTAL IMPLEMENTED Savings:
$22,065
Cost:
$57,690
$19,494 253,159 $(-150) - $2,721 - $19,494
253,159
kWh
$(-150)
-
$
$2,721
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Personnel Changes Ancillary Material Cost Electricity Usage Personnel Changes Ancillary Material Cost