Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2016 |
Principal Product | Testing equipment |
NAICS | 334516 - Analytical Laboratory Instrument Manufacturing |
SIC | 3826 - Analytical Instruments |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 1,000 Pieces |
Production Hrs. Annual | 3,060 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $71,972 | 1,112,400 | kWh | $0.06 |
Electricity Demand | $21,194 | 4,752 | kW-months/year | $4.46 |
TOTAL ENERGY COSTS | $93,166 | |||
RECOMMENDED SAVINGS* | $27,261 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,615 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS |
Savings: $2,610 Cost: $100 |
- | - | $2,610 | 584 | - | - | - | - |
- - kWh |
$2,610 584 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $19,606 Cost: $76,556 |
$11,986 | 185,251 | $3,459 | 774 | - | - | $4,161 | - |
$11,986 185,251 kWh |
$3,459 774 kW-months/year |
- - $ |
$4,161 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,685 Cost: $13,453 |
$3,140 | 48,537 | - | - | - | - | $545 | - |
$3,140 48,537 kWh |
- - kW-months/year |
- - $ |
$545 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $105 Cost: $200 |
$358 | 5,539 | $97 | 22 | $(-150) | - | $(-200) | - |
$358 5,539 kWh |
$97 22 kW-months/year |
$(-150) - $ |
$(-200) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $219 Cost: $100 |
$172 | 2,665 | $47 | 10 | - | - | - | - |
$172 2,665 kWh |
$47 10 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $418 Cost: $75 |
$418 | 6,454 | - | - | - | - | - | - |
$418 6,454 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $618 Cost: $160 |
$277 | 4,275 | $26 | 6 | - | - | $315 | - |
$277 4,275 kWh |
$26 6 kW-months/year |
- - $ |
$315 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,261 Cost: $90,644 |
$16,351 | 252,721 | $6,239 | 1,396 | $(-150) | - | $4,821 | - | $16,351 252,721 kWh |
$6,239 1,396 kW-months/year |
$(-150) - $ |
$4,821 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,615 Cost: $90,309 |
$15,656 | 241,992 | $3,603 | 806 | $(-150) | - | $4,506 | - | $15,656 241,992 kWh |
$3,603 806 kW-months/year |
$(-150) - $ |
$4,506 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost |