IAC logo
IAC Assessment: NC0575
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0575
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2016
Principal Product Fiber optic cables
NAICS 335921 - Fiber Optic Cable Manufacturing
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 55,000
Annual Production 800,000 Units
Production Hrs. Annual 3,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,157 498,881 kWh $0.05
Electricity Demand $27,694 2,400 kW-months/year $11.54
Natural Gas $4,081 565 MMBtu $7.22
TOTAL ENERGY COSTS $54,932
RECOMMENDED SAVINGS* $23,445 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,087
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$7,250
Cost:
$500
- - $7,250 734 - - -
-
kWh
$7,250
734
kW-months/year
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$4,087
Cost:
$100
$(-10,875) - $14,962 - - - $(-10,875)
-
kWh
$14,962
-
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,862
Cost:
$21,540
$5,239 112,917 $4,014 348 $1,609 - $5,239
112,917
kWh
$4,014
348
kW-months/year
$1,609
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$750
Cost:
$475
$384 8,280 $319 28 $47 - $384
8,280
kWh
$319
28
kW-months/year
$47
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$338
Cost:
$100
$252 5,431 $86 7 - - $252
5,431
kWh
$86
7
kW-months/year
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$158
Cost:
$300
$158 3,399 - - - - $158
3,399
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$23,445
Cost:
$23,015
$(-4,842) 130,027 $26,631 1,117 $1,656 - $(-4,842)
130,027
kWh
$26,631
1,117
kW-months/year
$1,656
-
$
TOTAL IMPLEMENTED Savings:
$12,087
Cost:
$1,075
$(-10,491) 8,280 $22,531 762 $47 - $(-10,491)
8,280
kWh
$22,531
762
kW-months/year
$47
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost