IAC Assessment: NC0577
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0577
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2016
Principal Product Lighting
NAICS 335110 - Electric Lamp Bulb and Part Manufacturing
SIC 3641 - Electric Lamps
Sales $100,000,000-$500,000,000
# of Employees 330
Plant Area (Sq.Ft.) 310,000
Annual Production 2,000,000 Units
Production Hrs. Annual 6,000
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $266,142 6,700,800 kWh $0.04
Electricity Demand $315,726 18,714 kW-months/year $16.87
Natural Gas $161,294 38,426 MMBtu $4.20
TOTAL ENERGY COSTS $743,162
RECOMMENDED SAVINGS* $83,056 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$59,300
Cost:
$135,630
$27,119 683,100 $23,078 1,368 - - - - - - $9,103 - $27,119
683,100
kWh
$23,078
1,368
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$9,103
-
$
02: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS Savings:
$11,227
Cost:
$15,000
$1,266 31,883 $2,541 151 $7,420 1,767 - - - - - - $1,266
31,883
kWh
$2,541
151
kW-months/year
$7,420
1,767
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$819
Cost:
$100
$767 19,320 $652 39 - - - - $(-300) - $(-300) - $767
19,320
kWh
$652
39
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-300)
-
$
$(-300)
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,088
Cost:
$3,600
$1,088 27,393 - - - - - - - - - - $1,088
27,393
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,896
Cost:
$100
$1,566 39,437 $1,330 79 - - - - - - - - $1,566
39,437
kWh
$1,330
79
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,793
Cost:
$2,000
$970 24,420 $823 49 - - - - - - - - $970
24,420
kWh
$823
49
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$168
Cost:
$799
- - - - $168 40 - - - - - - -
-
kWh
-
-
kW-months/year
$168
40
MMBtu
-
-
Tgal
-
-
$
-
-
$
08: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$106
Cost:
$200
- - - - $106 25 - - - - - - -
-
kWh
-
-
kW-months/year
$106
25
MMBtu
-
-
Tgal
-
-
$
-
-
$
09: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$5,659
Cost:
$7,720
- - - - - - $5,659 459 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,659
459
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$83,056
Cost:
$165,149
$32,776 825,553 $28,424 1,686 $7,694 1,832 $5,659 459 $(-300) - $8,803 - $32,776
825,553
kWh
$28,424
1,686
kW-months/year
$7,694
1,832
MMBtu
$5,659
459
Tgal
$(-300)
-
$
$8,803
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Usage Personnel Changes Ancillary Material Cost