Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2016 |
Principal Product | Fabricated metal |
NAICS | 332710 - Machine Shops |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 330,000 Units |
Production Hrs. Annual | 2,750 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $62,094 | 835,991 | kWh | $0.07 |
Electricity Demand | $11,218 | 3,796 | kW-months/year | $2.96 |
Natural Gas | $29,449 | 3,692 | MMBtu | $7.98 |
Wood | $395 | 1,010 | MMBtu | $0.39 |
TOTAL ENERGY COSTS | $107,486 | |||
RECOMMENDED SAVINGS* | $29,751 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,062 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $2,781 Cost: $4,200 |
$1,940 | 26,109 | $841 | 202 | - | - | - | - | - | - |
$1,940 26,109 kWh |
$841 202 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $513 Cost: $100 |
$694 | 9,334 | $169 | 41 | - | - | $(-150) | - | $(-200) | - |
$694 9,334 kWh |
$169 41 kW-months/year |
- - gal |
$(-150) - $ |
$(-200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $16,544 Cost: $29,200 |
$13,299 | 178,997 | $3,245 | 780 | - | - | - | - | - | - |
$13,299 178,997 kWh |
$3,245 780 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $110 Cost: $400 |
$110 | 1,487 | - | - | - | - | - | - | - | - |
$110 1,487 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $434 Cost: $150 |
$434 | 5,841 | - | - | - | - | - | - | - | - |
$434 5,841 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2491 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING |
Savings: $2,084 Cost: $50 |
$1,675 | 22,544 | $409 | 98 | - | - | - | - | - | - |
$1,675 22,544 kWh |
$409 98 kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $1,280 Cost: $1,300 |
$(-306) | (-4,125) | $(-75) | (-18) | $1,661 | 1,266 | - | - | - | - |
$(-306) (-4,125) kWh |
$(-75) (-18) kW-months/year |
$1,661 1,266 gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,938 Cost: $9,207 |
$4,065 | 54,717 | $858 | 206 | - | - | - | - | $1,015 | - |
$4,065 54,717 kWh |
$858 206 kW-months/year |
- - gal |
- - $ |
$1,015 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $67 Cost: $100 |
$67 | 908 | - | - | - | - | - | - | - | - |
$67 908 kWh |
- - kW-months/year |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $29,751 Cost: $44,707 |
$21,978 | 295,812 | $5,447 | 1,309 | $1,661 | 1,266 | $(-150) | - | $815 | - | $21,978 295,812 kWh |
$5,447 1,309 kW-months/year |
$1,661 1,266 gal |
$(-150) - $ |
$815 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,062 Cost: $38,607 |
$18,125 | 243,956 | $4,272 | 1,027 | - | - | $(-150) | - | $815 | - | $18,125 243,956 kWh |
$4,272 1,027 kW-months/year |
- - gal |
$(-150) - $ |
$815 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost |