IAC logo
IAC Assessment: NC0587
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0587
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2017
Principal Product Hydraulic pumps and motors
NAICS 333911 - Pump and Pumping Equipment Manufacturing
SIC 3561 - Pumps And Pumping Equipment
Sales $50,000,000-$100,000,000
# of Employees 259
Plant Area (Sq.Ft.) 184,000
Annual Production 180,000 Pieces
Production Hrs. Annual 6,864
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $665,035 10,845,400 kWh $0.06
Electricity Demand $192,469 23,715 kW-months/year $8.12
Natural Gas $15,852 2,229 MMBtu $7.11
TOTAL ENERGY COSTS $873,356
RECOMMENDED SAVINGS* $135,158 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $72,078
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ $ $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$64,592
Cost:
$221,073
$47,219 770,296 $11,234 1,383 - - $6,139 - - - $47,219
770,296
kWh
$11,234
1,383
kW-months/year
-
-
$
$6,139
-
$
-
-
Tgal
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$375
Cost:
$75
$252 4,118 $58 7 - - $65 - - - $252
4,118
kWh
$58
7
kW-months/year
-
-
$
$65
-
$
-
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$798
Cost:
$400
$798 13,024 - - - - - - - - $798
13,024
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
Tgal
04: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$62,705
Cost:
$158,000
$42,413 691,892 $26,225 3,230 - - - - $(-5,933) - $42,413
691,892
kWh
$26,225
3,230
kW-months/year
-
-
$
-
-
$
$(-5,933)
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,666
Cost:
$500
$3,139 51,205 $727 90 $(-100) - $(-100) - - - $3,139
51,205
kWh
$727
90
kW-months/year
$(-100)
-
$
$(-100)
-
$
-
-
Tgal
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,022
Cost:
$1,200
$3,022 49,280 - - - - - - - - $3,022
49,280
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$135,158
Cost:
$381,248
$96,843 1,579,815 $38,244 4,710 $(-100) - $6,104 - $(-5,933) - $96,843
1,579,815
kWh
$38,244
4,710
kW-months/year
$(-100)
-
$
$6,104
-
$
$(-5,933)
-
Tgal
TOTAL IMPLEMENTED Savings:
$72,078
Cost:
$223,173
$54,178 883,805 $11,961 1,473 $(-100) - $6,039 - - - $54,178
883,805
kWh
$11,961
1,473
kW-months/year
$(-100)
-
$
$6,039
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Water Consumption