IAC logo
IAC Assessment: NC0588
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0588
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2017
Principal Product Wastewater treatment plant
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $50,000,000-$100,000,000
# of Employees 37
Plant Area (Sq.Ft.) 50,000
Annual Production 10,000,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $351,292 13,972,000 kWh $0.03
Electricity Demand $516,032 29,698 kW-months/year $17.38
Electricity Fees $98,484 - $ -
Natural Gas $40,000 10,075 MMBtu $3.97
TOTAL ENERGY COSTS $1,005,808
RECOMMENDED SAVINGS* $82,498 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,052
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$24,750
Cost:
$80,000
- - - - $24,750 6,234 - - -
-
kWh
-
-
kW-months/year
$24,750
6,234
MMBtu
-
-
$
02: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$4,845
Cost:
$38,000
$2,343 103,200 $2,502 144 - - - - $2,343
103,200
kWh
$2,502
144
kW-months/year
-
-
MMBtu
-
-
$
03: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$26,851
Cost:
$133,000
$12,982 571,900 $13,869 798 - - - - $12,982
571,900
kWh
$13,869
798
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,766
Cost:
$97,500
$6,711 295,650 $14,075 840 - - $2,980 - $6,711
295,650
kWh
$14,075
840
kW-months/year
-
-
MMBtu
$2,980
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,286
Cost:
$5,865
$891 39,257 $1,395 78 - - - - $891
39,257
kWh
$1,395
78
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$82,498
Cost:
$354,365
$22,927 1,010,007 $31,841 1,860 $24,750 6,234 $2,980 - $22,927
1,010,007
kWh
$31,841
1,860
kW-months/year
$24,750
6,234
MMBtu
$2,980
-
$
TOTAL IMPLEMENTED Savings:
$26,052
Cost:
$103,365
$7,602 334,907 $15,470 918 - - $2,980 - $7,602
334,907
kWh
$15,470
918
kW-months/year
-
-
MMBtu
$2,980
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost