IAC Assessment: NC0589
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0589
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2017
Principal Product Urethane and rubber coated fabrics
NAICS 313320 - Fabric Coating Mills
SIC 2295 - Coated Fabrics, Not Rubberized
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 250,000
Annual Production 12,000 Thousand Feet
Production Hrs. Annual 8,600
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $367,134 9,361,920 kWh $0.04
Electricity Demand $222,964 20,466 kW-months/year $10.89
Electricity Fees $811 - $ -
Natural Gas $515,112 101,004 MMBtu $5.10
TOTAL ENERGY COSTS $1,106,021
RECOMMENDED SAVINGS* $129,451 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,979
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$38,378
Cost:
$62,575
- - - - $38,378 7,525 - - - - - - -
-
kWh
-
-
kW-months/year
$38,378
7,525
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,080
Cost:
$19,100
$10,080 257,140 - - - - - - - - - - $10,080
257,140
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$4,455
Cost:
$10,000
- - - - $4,455 873 - - - - - - -
-
kWh
-
-
kW-months/year
$4,455
873
MMBtu
-
-
$
-
-
$
-
-
$
04: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$28,966
Cost:
$135,750
$(-6,139) (-156,600) $(-7,895) (-692) - - - - - - $43,000 - $(-6,139)
(-156,600)
kWh
$(-7,895)
(-692)
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$43,000
-
$
05: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$11,593
Cost:
$10,750
$(-7,046) (-179,740) $(-2,861) (-251) - - - - $21,500 - - - $(-7,046)
(-179,740)
kWh
$(-2,861)
(-251)
kW-months/year
-
-
MMBtu
-
-
$
$21,500
-
$
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,876
Cost:
$840
- - - - $3,876 760 - - - - - - -
-
kWh
-
-
kW-months/year
$3,876
760
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,357
Cost:
$1,000
- - - - $1,357 266 - - - - - - -
-
kWh
-
-
kW-months/year
$1,357
266
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$29,155
Cost:
$66,186
$14,678 374,448 $7,031 616 - - - - $7,446 - - - $14,678
374,448
kWh
$7,031
616
kW-months/year
-
-
MMBtu
-
-
$
$7,446
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$541
Cost:
$300
$162 4,120 $64 6 - - - - $315 - - - $162
4,120
kWh
$64
6
kW-months/year
-
-
MMBtu
-
-
$
$315
-
$
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,050
Cost:
$100
$1,315 33,540 $535 47 - - $(-600) - $(-200) - - - $1,315
33,540
kWh
$535
47
kW-months/year
-
-
MMBtu
$(-600)
-
$
$(-200)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$129,451
Cost:
$306,601
$13,050 332,908 $(-3,126) (-274) $48,066 9,424 $(-600) - $29,061 - $43,000 - $13,050
332,908
kWh
$(-3,126)
(-274)
kW-months/year
$48,066
9,424
MMBtu
$(-600)
-
$
$29,061
-
$
$43,000
-
$
TOTAL IMPLEMENTED Savings:
$35,979
Cost:
$68,426
$16,155 412,108 $7,630 669 $5,233 1,026 $(-600) - $7,561 - - - $16,155
412,108
kWh
$7,630
669
kW-months/year
$5,233
1,026
MMBtu
$(-600)
-
$
$7,561
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product