Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2017 |
Principal Product | Urethane and rubber coated fabrics |
NAICS | 313320 - Fabric Coating Mills |
SIC | 2295 - Coated Fabrics, Not Rubberized |
Sales | $50,000,000-$100,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 12,000 Thousand Feet |
Production Hrs. Annual | 8,600 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $367,134 | 9,361,920 | kWh | $0.04 |
Electricity Demand | $222,964 | 20,466 | kW-months/year | $10.89 |
Electricity Fees | $811 | - | $ | - |
Natural Gas | $515,112 | 101,004 | MMBtu | $5.10 |
TOTAL ENERGY COSTS | $1,106,021 | |||
RECOMMENDED SAVINGS* | $129,451 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $35,979 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $38,378 Cost: $62,575 |
- | - | - | - | $38,378 | 7,525 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$38,378 7,525 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $10,080 Cost: $19,100 |
$10,080 | 257,140 | - | - | - | - | - | - | - | - | - | - |
$10,080 257,140 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS |
Savings: $4,455 Cost: $10,000 |
- | - | - | - | $4,455 | 873 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,455 873 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $28,966 Cost: $135,750 |
$(-6,139) | (-156,600) | $(-7,895) | (-692) | - | - | - | - | - | - | $43,000 | - |
$(-6,139) (-156,600) kWh |
$(-7,895) (-692) kW-months/year |
- - MMBtu |
- - $ |
- - $ |
$43,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE |
Savings: $11,593 Cost: $10,750 |
$(-7,046) | (-179,740) | $(-2,861) | (-251) | - | - | - | - | $21,500 | - | - | - |
$(-7,046) (-179,740) kWh |
$(-2,861) (-251) kW-months/year |
- - MMBtu |
- - $ |
$21,500 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $3,876 Cost: $840 |
- | - | - | - | $3,876 | 760 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,876 760 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,357 Cost: $1,000 |
- | - | - | - | $1,357 | 266 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,357 266 MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $29,155 Cost: $66,186 |
$14,678 | 374,448 | $7,031 | 616 | - | - | - | - | $7,446 | - | - | - |
$14,678 374,448 kWh |
$7,031 616 kW-months/year |
- - MMBtu |
- - $ |
$7,446 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $541 Cost: $300 |
$162 | 4,120 | $64 | 6 | - | - | - | - | $315 | - | - | - |
$162 4,120 kWh |
$64 6 kW-months/year |
- - MMBtu |
- - $ |
$315 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,050 Cost: $100 |
$1,315 | 33,540 | $535 | 47 | - | - | $(-600) | - | $(-200) | - | - | - |
$1,315 33,540 kWh |
$535 47 kW-months/year |
- - MMBtu |
$(-600) - $ |
$(-200) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $129,451 Cost: $306,601 |
$13,050 | 332,908 | $(-3,126) | (-274) | $48,066 | 9,424 | $(-600) | - | $29,061 | - | $43,000 | - | $13,050 332,908 kWh |
$(-3,126) (-274) kW-months/year |
$48,066 9,424 MMBtu |
$(-600) - $ |
$29,061 - $ |
$43,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $35,979 Cost: $68,426 |
$16,155 | 412,108 | $7,630 | 669 | $5,233 | 1,026 | $(-600) | - | $7,561 | - | - | - | $16,155 412,108 kWh |
$7,630 669 kW-months/year |
$5,233 1,026 MMBtu |
$(-600) - $ |
$7,561 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Primary Product |