IAC Assessment: NC0591
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0591
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2017
Principal Product Office casegoods furniture
NAICS 337211 - Wood Office Furniture Manufacturing
SIC 2521 - Wood Office Furniture
Sales $10,000,000-$50,000,000
# of Employees 192
Plant Area (Sq.Ft.) 250,000
Annual Production 48,155 Pieces
Production Hrs. Annual 2,375
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $319,311 5,180,160 kWh $0.06
Electricity Demand $83,938 18,778 kW-months/year $4.47
Natural Gas $71,053 10,369 MMBtu $6.85
Wood $93,986 37,600 MMBtu $2.50
TOTAL ENERGY COSTS $568,288
RECOMMENDED SAVINGS* $53,762 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,643
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$30,408
Cost:
$87,579
$18,785 304,464 $6,905 1,545 - - - - $4,718 - $18,785
304,464
kWh
$6,905
1,545
kW-months/year
-
-
MMBtu
-
-
$
$4,718
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,501
Cost:
$4,590
$1,414 22,916 - - - - - - $87 - $1,414
22,916
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$87
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$52
Cost:
$100
$52 842 - - - - - - - - $52
842
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$9,474
Cost:
$24,000
- - - - $9,474 1,383 - - - - -
-
kWh
-
-
kW-months/year
$9,474
1,383
MMBtu
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,208
Cost:
$200
$1,799 29,165 $659 147 - - $(-100) - $(-150) - $1,799
29,165
kWh
$659
147
kW-months/year
-
-
MMBtu
$(-100)
-
$
$(-150)
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$10,119
Cost:
$20,000
$7,407 120,051 $2,712 607 - - - - - - $7,407
120,051
kWh
$2,712
607
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$53,762
Cost:
$136,469
$29,457 477,438 $10,276 2,299 $9,474 1,383 $(-100) - $4,655 - $29,457
477,438
kWh
$10,276
2,299
kW-months/year
$9,474
1,383
MMBtu
$(-100)
-
$
$4,655
-
$
TOTAL IMPLEMENTED Savings:
$43,643
Cost:
$116,469
$22,050 357,387 $7,564 1,692 $9,474 1,383 $(-100) - $4,655 - $22,050
357,387
kWh
$7,564
1,692
kW-months/year
$9,474
1,383
MMBtu
$(-100)
-
$
$4,655
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost