Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2017 |
Principal Product | Coxial cable |
NAICS | 335929 - Other Communication and Energy Wire Manufacturing |
SIC | 3357 - Nonferrous Wiredrawing & Insulating |
Sales | $5,000,000-$10,000,000 |
# of Employees | 20 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 10,000 Thousand Feet |
Production Hrs. Annual | 4,160 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $74,864 | 807,600 | kWh | $0.09 |
Electricity Demand | $13,636 | 3,520 | kW-months/year | $3.87 |
Electricity Fees | $383 | - | $ | - |
Natural Gas | $298 | 32 | MMBtu | $9.31 |
TOTAL ENERGY COSTS | $89,181 | |||
RECOMMENDED SAVINGS* | $36,595 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $36,595 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $17,321 Cost: $14,000 |
$15,463 | 166,806 | $1,858 | 480 | - | - | - | - |
$15,463 166,806 kWh |
$1,858 480 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,653 Cost: $100 |
$2,368 | 25,542 | $285 | 74 | - | - | - | - |
$2,368 25,542 kWh |
$285 74 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,020 Cost: $200 |
$1,134 | 12,230 | $136 | 35 | $(-100) | - | $(-150) | - |
$1,134 12,230 kWh |
$136 35 kW-months/year |
$(-100) - $ |
$(-150) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $2,944 Cost: $5,070 |
$2,629 | 28,355 | $315 | 81 | - | - | - | - |
$2,629 28,355 kWh |
$315 81 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $467 Cost: $25 |
$417 | 4,493 | $50 | 13 | - | - | - | - |
$417 4,493 kWh |
$50 13 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $12,190 Cost: $23,263 |
$10,487 | 113,127 | $1,276 | 330 | - | - | $427 | - |
$10,487 113,127 kWh |
$1,276 330 kW-months/year |
- - $ |
$427 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $36,595 Cost: $42,658 |
$32,498 | 350,553 | $3,920 | 1,013 | $(-100) | - | $277 | - | $32,498 350,553 kWh |
$3,920 1,013 kW-months/year |
$(-100) - $ |
$277 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $36,595 Cost: $42,658 |
$32,498 | 350,553 | $3,920 | 1,013 | $(-100) | - | $277 | - | $32,498 350,553 kWh |
$3,920 1,013 kW-months/year |
$(-100) - $ |
$277 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost |