Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2017 |
Principal Product | Socks |
NAICS | 315110 - Hosiery and Sock Mills |
SIC | 2252 - Hosiery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 185 |
Plant Area (Sq.Ft.) | 130,000 |
Annual Production | 6,300,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $212,284 | 4,822,200 | kWh | $0.04 |
Electricity Demand | $122,915 | 10,401 | kW-months/year | $11.82 |
Natural Gas | $107,000 | 10,693 | MMBtu | $10.01 |
TOTAL ENERGY COSTS | $442,199 | |||
RECOMMENDED SAVINGS* | $35,132 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,787 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $29,435 Cost: $144,553 |
$18,325 | 411,798 | $11,110 | 940 | - | - | - | - | - | - |
$18,325 411,798 kWh |
$11,110 940 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $896 Cost: $100 |
$852 | 19,156 | $444 | 38 | - | - | $(-200) | - | $(-200) | - |
$852 19,156 kWh |
$444 38 kW-months/year |
- - MMBtu |
$(-200) - $ |
$(-200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM |
Savings: $375 Cost: $552 |
$245 | 5,500 | $130 | 11 | - | - | - | - | - | - |
$245 5,500 kWh |
$130 11 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2521 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS |
Savings: $3,516 Cost: $400 |
$761 | 17,100 | $405 | 34 | $2,350 | 235 | - | - | - | - |
$761 17,100 kWh |
$405 34 kW-months/year |
$2,350 235 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $910 Cost: $2,000 |
- | - | - | - | $910 | 91 | - | - | - | - |
- - kWh |
- - kW-months/year |
$910 91 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $35,132 Cost: $147,605 |
$20,183 | 453,554 | $12,089 | 1,023 | $3,260 | 326 | $(-200) | - | $(-200) | - | $20,183 453,554 kWh |
$12,089 1,023 kW-months/year |
$3,260 326 MMBtu |
$(-200) - $ |
$(-200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,787 Cost: $1,052 |
$1,858 | 41,756 | $979 | 83 | $2,350 | 235 | $(-200) | - | $(-200) | - | $1,858 41,756 kWh |
$979 83 kW-months/year |
$2,350 235 MMBtu |
$(-200) - $ |
$(-200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |