Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2017 |
Principal Product | Chicken |
NAICS | 311615 - Poultry Processing |
SIC | 2015 - Poultry Slaughtering And Processing |
Sales | $100,000,000-$500,000,000 |
# of Employees | 720 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 2,400,000 Pounds |
Production Hrs. Annual | 6,600 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $560,166 | 12,955,000 | kWh | $0.04 |
Electricity Demand | $286,580 | 25,152 | kW-months/year | $11.39 |
Natural Gas | $281,263 | 67,293 | MMBtu | $4.18 |
TOTAL ENERGY COSTS | $1,128,009 | |||
RECOMMENDED SAVINGS* | $115,530 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,718 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $23,879 Cost: $54,333 |
$12,710 | 294,204 | $7,799 | 685 | - | - | - | - | $3,370 | - |
$12,710 294,204 kWh |
$7,799 685 kW-months/year |
- - MMBtu |
- - $ |
$3,370 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,718 Cost: $100 |
$1,702 | 39,402 | $816 | 72 | - | - | $(-400) | - | $(-400) | - |
$1,702 39,402 kWh |
$816 72 kW-months/year |
- - MMBtu |
$(-400) - $ |
$(-400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $41,579 Cost: $200,000 |
- | - | - | - | $41,579 | 9,947 | - | - | - | - |
- - kWh |
- - kW-months/year |
$41,579 9,947 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $30,012 Cost: $39,000 |
$9,800 | 226,857 | $4,647 | 408 | $15,565 | 3,724 | - | - | - | - |
$9,800 226,857 kWh |
$4,647 408 kW-months/year |
$15,565 3,724 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $18,342 Cost: $85,000 |
$18,533 | 429,000 | $8,884 | 780 | $(-9,075) | (-2,171) | - | - | - | - |
$18,533 429,000 kWh |
$8,884 780 kW-months/year |
$(-9,075) (-2,171) MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $115,530 Cost: $378,433 |
$42,745 | 989,463 | $22,146 | 1,945 | $48,069 | 11,500 | $(-400) | - | $2,970 | - | $42,745 989,463 kWh |
$22,146 1,945 kW-months/year |
$48,069 11,500 MMBtu |
$(-400) - $ |
$2,970 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,718 Cost: $100 |
$1,702 | 39,402 | $816 | 72 | - | - | $(-400) | - | $(-400) | - | $1,702 39,402 kWh |
$816 72 kW-months/year |
- - MMBtu |
$(-400) - $ |
$(-400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |