Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2017
Principal Product Chicken
NAICS 311615 - Poultry Processing
SIC 2015 - Poultry Slaughtering And Processing
Sales $100,000,000-$500,000,000
# of Employees 720
Plant Area (Sq.Ft.) 125,000
Annual Production 2,400,000 Pounds
Production Hrs. Annual 6,600
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $560,166 12,955,000 kWh $0.04
Electricity Demand $286,580 25,152 kW-months/year $11.39
Natural Gas $281,263 67,293 MMBtu $4.18
TOTAL ENERGY COSTS $1,128,009
RECOMMENDED SAVINGS* $115,530 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,718
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,879
Cost:
$54,333
$12,710 294,204 $7,799 685 - - - - $3,370 - $12,710
294,204
kWh
$7,799
685
kW-months/year
-
-
MMBtu
-
-
$
$3,370
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,718
Cost:
$100
$1,702 39,402 $816 72 - - $(-400) - $(-400) - $1,702
39,402
kWh
$816
72
kW-months/year
-
-
MMBtu
$(-400)
-
$
$(-400)
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$41,579
Cost:
$200,000
- - - - $41,579 9,947 - - - - -
-
kWh
-
-
kW-months/year
$41,579
9,947
MMBtu
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$30,012
Cost:
$39,000
$9,800 226,857 $4,647 408 $15,565 3,724 - - - - $9,800
226,857
kWh
$4,647
408
kW-months/year
$15,565
3,724
MMBtu
-
-
$
-
-
$
05: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$18,342
Cost:
$85,000
$18,533 429,000 $8,884 780 $(-9,075) (-2,171) - - - - $18,533
429,000
kWh
$8,884
780
kW-months/year
$(-9,075)
(-2,171)
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$115,530
Cost:
$378,433
$42,745 989,463 $22,146 1,945 $48,069 11,500 $(-400) - $2,970 - $42,745
989,463
kWh
$22,146
1,945
kW-months/year
$48,069
11,500
MMBtu
$(-400)
-
$
$2,970
-
$
TOTAL IMPLEMENTED Savings:
$1,718
Cost:
$100
$1,702 39,402 $816 72 - - $(-400) - $(-400) - $1,702
39,402
kWh
$816
72
kW-months/year
-
-
MMBtu
$(-400)
-
$
$(-400)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost